3.02.08. Administration
Sobre este texto
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Applications for a development permit within the watershed district shall include:
A. Site plans required. Except for the exemptions listed in this section, all forms of development within the watershed district shall be required to have a site plan prepared and approved according to this section before any building permits or other development related permits may be issued or any land-disturbing activity may take place.
B. Information required. Each site plan submitted under this section shall include the following:
1. A site plan drawn to a scale of not less than one (1) inch equals fifty (50) feet showing all planned improvements including the width, depth and length of all existing and proposed structures, roads, watercourses and drainageways;
water, wastewater and stormwater facilities; and utility installations.
2. Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site.
3. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.
4. Elevations of the site and adjacent lands within two hundred (200) feet of the site at contour intervals of no greater than five (5) feet.
5. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.
6. Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation.
Elevations, horizontal scale and vertical scale must be shown on crosssectional drawings.
C. Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan, that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill or removal of vegetation during construction or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of the Director of Planning and Development. Minor changes, such as realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement.
D. Exemptions from site plan requirement. The following activities and developments are exempt from the requirement for detailed site plans:
1. Single-family detached homes constructed within a subdivision of fewer than five (5) parcels.
2. Repairs to a facility that is part of a previously approved and permitted development.
3. Construction of minor structures, such as sheds or additions to single-family residences.
E. Pre-application conference. A pre-application conference between the applicant and the Director of Planning and Development can be scheduled at the request of the applicant. The purpose of the meeting is to review local land use restrictions, site plan requirements and the permitting process.
F. Filing fee
1. At the time of the application, the applicant shall pay a filing fee specified by the County or its designee.
2. Filing fees up to a maximum of one hundred dollars ($100.00) may be required to evaluate the application.
3. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment and mitigation measures as deemed necessary by the Director of Planning and Development.
G. Review procedures
1. The application shall be made to the Director of Planning and Development and will be reviewed within thirty (30) days.
2. The review period shall include the preparation of findings (approval or disapproval) by the Director of Planning and Development.
3. The applicant will receive written notification of the findings of the Director of Planning and Development.
4. If the review process is not completed within thirty (30) days, the application is considered to be approved.
H. Appeals
1. Decisions on permit applications made by the Director of Planning and Development may be appealed to the Gordon County Planning Commission.
2. The appeal must be made within thirty (30) days of the decision rendered by the Director of Planning and Development.
3. A public hearing shall be held for appeals.
4. Public announcement of the hearing shall be printed in local newspapers at least fifteen (15) days prior to the hearing.
5. Any person may offer testimony at the hearing.
6. The decision of the Gordon County Planning Commission may be appealed to a court of competent jurisdiction, as discussed in Section 3.02.11.
I. Public notice and public hearing
1. Public notice of permit applications, through publication in local newspapers, is required.
2. A public hearing on the application may be scheduled if requested by a citizen.
3. Notice of the public hearing, through a local newspaper of general circulation, must be published at least fifteen (15) days prior to the hearing.
4. A record of the proceedings shall be made and kept on file by the County or its designee.
5. Any person may testify at the hearing.
J. Duration of permit validity
1. If construction described in the development permit has not commenced within twelve (12) months from the date of issuance, the permit shall expire.
2. If construction described in the development permit is suspended after work has commenced, the permit shall expire twelve (12) months after the date that work ceased. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as far as practicable.