Gordon County · Ordenanza de zonificación
Chapter 6 - INFRASTRUCTURE IMPROVEMENTS
6.04.03. Piping
Sobre este texto
- As published by Municode, current through 2024-03-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Storm drainage piping shall be sloped so as to maintain a velocity of three (3) fps to prevent the collection of sediment.
B. All pipes in a County right-of-way shall be a minimum of eighteen (18) inches in diameter. No storm drain pipe parallel to any existing or proposed County roads shall be placed beneath a proposed deceleration lane without the approval of the County.
C. The inlet and outlet of all storm drain pipes shall have concrete head walls or a metal flared-end section meeting the standards of the Georgia Department of Transportation.
D. On only the downstream side of a roadway, storm drain pipes thirty-six (36) inches in diameter or smaller shall extend a minimum of twenty (20) feet past the rear of any building for all zoning districts except A-1 (Agriculture) districts. Storm drain pipes larger than thirty-six (36) inches in diameter at a minimum shall extend from edge of right-of-way to edge of right-of-way. The drainage ditch on each end of the pipe shall be designed to limit runoff velocity to less than five (5) fps, or the ditch must be lined to prevent erosion. Storm drain pipes shall be installed no later than the construction of the foundation of the structure which is permitted.
E. The maximum continuous length for pipes shall be three hundred (300) feet for pipes less than forty-two (42) inches. Junction boxes providing pipe access shall be constructed to current Georgia Department of Transportation standards. Junction box covers shall not be made of plastic.
F. All manmade stormwater drainage ditches shall be designed by an appropriate state approved professional. The ditch profile and typical cross sections, including the velocity of flow, shall be shown on the plans. Maximum velocity for unlined ditches shall be five (5) fps design flow.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.