Ir al contenido
Georgia Commons
Menú

Gray · Ordenanza de zonificación

Appendix A - ZONING AND SUBDIVISION REGULATIONS / Article XIV - REQUIRED SUBDIVISION IMPROVEMENTS

148.6. Cost of improvements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

148.61. Subdivider's responsibility. The subdivider shall incur the cost of construction and installation of all required public improvements based on the following:

(1) Streets. Incur the cost for the construction of streets up to 27 feet in pavement width from back of curb, to back of curb, or 24 feet in pavement width from edge of pavement to edge of pavement if no curbs and gutters are installed.

(2) Water and sewer systems. Incur the cost for the installation of 211 water and sewer systems which is required to serve the new subdivision and tie in with existing water and sewer system, based on the specifications set forth herein.

(3) Sidewalks. Entire cost.

(4) Monuments. Entire cost.

(5) Traffic control and street signs. Entire cost.

148.62. Council's responsibility. The council shall partially participate in sharing the cost of construction and installation of required public improvements for the following conditions:

(1) Streets. Incur cost for any additional required pavement which in excess of 27 feet for streets with curbs and gutters and in excess of 24 feet for streets without curbs and gutters, and any additional grading and paving related thereto.

(2) Water and sewer systems. Incur cost for any difference in the cost of the laying of oversized pipe and outfall systems which are needed in excess of the required water and sewer facilities needed to exclusively serve the new subdivision as determined by the commission and council.

148.63. Property owner's responsibility. Whenever the council is petitioned by the property owners to upgrade a class II street to class I, the property owners shall then incur the entire cost for said improvements based on the footage along the property line of each lot abutting the street which is being improved and on the requirements in section 148.71 [sic] above.

148.64. Estimated costs for construction and installation. The current unit prices in effect at the time of submission of plans shall be used in determining the total estimated cost for construction and installation of required public improvements in new subdivisions.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:gray/zoning/148.6@2026-11-11-e52f9f211b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Gray Zoning Ordinance, 148.6. Cost of improvements | Georgia Commons