87.9.9. Certificate of design review application requirements and process. All

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

applications for design review approval shall be made as required by the zoning enforcement officer and shall, at minimum, contain the following information:

(i) Elevation drawings; color and material samples. Every application or review involving the construction of a new building or structure and alterations and/or additions to existing structures shall be accompanied by exterior elevation drawings drawn to scale and submitted in sufficient number of copies as required by the zoning enforcement officer. Said exterior elevation drawings shall clearly show, in sufficient detail the exterior appearance and architectural design of proposed change(s) to buildings or structures and new construction, as applicable. Each application shall also indicate proposed materials, textures and colors and provide samples of materials and colors. However, any �ordinary repair or maintenance� as previously defined in this document will not require such a certificate.

(ii) Photographs. All applications shall be accompanied by photographs of all sides of the existing building(s) or structure(s) affected, and of adjoining properties. Photographs shall be submitted in printed copy unless otherwise specified by the zoning enforcement officer.

(iii) Site plan and landscaping plan. For every application, a plot plan or site plan drawn to scale shall be submitted which shows all improvements affecting appearances, such as walls, walks, terraces, plantings, tree protection areas, accessory buildings, signs, lights, and other elements.

(iv) Fee. A fee, as may be established by the mayor and city council, shall be submitted with each application.

(v) Additional information. Any additional information, as may reasonably be required by the zoning enforcement officer, shall be submitted with the application.

87.9.10. All certificate of design review applications shall be submitted to the zoning enforcement officer at least ten days prior to the DRC's next regularly scheduled meeting. The zoning enforcement officer's written finding of completeness shall be required prior to processing the application.

87.9.11. For new developments, new buildings, and significant changes to existing developments and/or buildings, at least ten days before the next scheduled DRC meeting, an applicant may request from the zoning enforcement officer (�ZEO�) a preliminary review by the DRC of the applicant's application or plans. Upon notification by the ZEO of the request for a preliminary review, the DRC will add the request to the agenda for its next meeting. The only purpose of a preliminary review is to assist the applicant in completing the application but in no event will result in a final approval or denial of the application. The completed application shall be submitted to the ZEO at least ten days prior to the DRC's next regularly scheduled meeting. The DRC shall review the application and make a final decision on the application at its next scheduled meeting.

87.10. Decisions on applications for certificates of design review. The design review commission shall utilize the City of Gray Design Guideline Manual in evaluating all proposed projects requesting a certificate of design review.

87.10.1. Standards for certificate of design review decisions. The DRC shall issue a certificate of design review if it finds the proposed change(s) in appearance would not have a substantial adverse effect on the DDO and CDO districts.

The design review commission shall consider the appropriateness of any proposed material change in appearance in the context of the following criteria:

• Consistency with the City of Gray Design Guideline Manual for the type of development and/or the proposed use.

• The nature and character of the surrounding areas, and the consistency and compatibility of the proposed application with such nature and character.

• The general design; the character and appropriateness of design, scale of buildings, arrangement, materials, texture and colors (non-painted surfaces), of the structure in question; and the relation of such elements to similar features of structures in the immediate surrounding area; site and landscaping.

• The interior arrangement or use having no effect on exterior architectural features, safety or utility, shall not be considered.

• Among other grounds for considering a design inappropriate are the following defects: character foreign to the area; arresting or spectacular effects; a multiplicity or incongruity of details resulting in a restless and disturbing appearance; and the absence of unity and coherence in composition not in harmony with the density and character of the present structure(s) or surrounding area.

87.10.2. Approval. If an application is approved, the DRC will issue a certificate of design review to the applicant for the proposed work on the property. The DRC has the responsibility to follow up with the applicant after the work has been completed to ensure compliance with the certificate of design review.

87.10.3. Denial. The DRC shall deny a certificate of design Review if it finds the material change in appearance would have a substantial adverse effect on the DDO or CDO district. If an application is denied, the DRC will notify the applicant in writing of its decision and state the reason(s) for the denial. The DRC may suggest modifications or alternatives to the proposed alternation or new construction.

Applicants are strongly encouraged to meet with the DRC to discuss modifications which would make the project acceptable. The applicant may make modifications to the plans and resubmit a new or revised application for consideration by the DRC.

The denial by the DRC shall be binding upon the zoning enforcement officer, and no building permit shall be issued.

87.10.4. Time limit for approval or denial. The DRC shall approve or deny an application for a certificate of design review within 30 days after a fully completed application is filed with the Zoning Enforcement Officer. Failure of the Commission to act within 45 days shall be deemed an approval of the application and no other evidence of approval by the DRC shall be needed.

87.10.5. Requirement of conformance with certificate of design review. All changes to existing buildings and proposed new construction shall conform to the certificate of design review issued for the project. In the event work is not performed in accordance with such certificate, the DRC shall notify the zoning enforcement officer to issue a stop work order.

87.10.6. Certificate of design review void if construction not commenced. An approved certificate of design review shall be valid for 18 months, after which time it shall expire. Upon expiration, a new application must be submitted and a new certificate of design review issued by the design review commission prior to commencement of any construction or building modifications.

87.10.7. Appeals. Any person adversely affected by any determination made by the DRC relative to the issuance or denial of a certificate of design review may appeal such determination to the City Council of Gray. The appeal must clearly set forth all alleged errors, and must be filed with the zoning enforcement officer's office within 30 days after the date of the DRC's decision. After a public hearing by the mayor and city council, the council may either approve the decision, modify the decision, or reject the decision, if it finds that the DRC abused its discretion by acting arbitrarily and/or in violation of constitutional rights in reaching its decision.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:gray/zoning/87.9.9@2026-11-11-5774e04948

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Gray Zoning Ordinance, 87.9.9. Certificate of design review application requirements and process. All | Georgia Commons