Greenville · Ordenanza de zonificación
Appendix A - ZONING / Article 8 - BUFFER REQUIREMENTS
8.1. Determination of Buffer Requirements between Residential, Commercial and
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Industrial Zones.
When two adjoining properties are in dissimilar residential, commercial or industrial zone districts as indicated in Table 8.1, the property within the zone district allowing the most intensive uses is required to provide the buffer when acquiring a building permit unless the buffer was pre-existing. When two adjoining vacant parcels are in dissimilar zone districts as indicated in Table 8.1, no buffer is required when the parcel zoned for the less intensive use acquires a building permit.
8.1-1. Buffer Requirement. The required buffer shall consist of plantings or a fence, wall (not otherwise part of a structure or accessory structure), or a berm, which meets the screening standards of Section 8.2. If plantings are chosen as the method of screening, the planting area shall have a minimum base width of twelve (12) feet.
8.1-2. Buffer Requirement. The required buffer shall consist of a fifty (50) foot setback from the adjoining property line containing not less than a twenty (20) foot base width consisting of plantings plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of Section 8.2.
8.1-3. Buffer Requirement. The required buffer shall consist of a one hundred (100) foot setback from the adjoining property line containing not less than a twenty (20) foot base width consisting of plantings plus a fence, wall (not otherwise part of a structure or accessory structure), a berm, or any combination thereof, which meets the screening standards of Section 8.2.
8.1-4. Buffer Requirement. The required buffer shall consist of either an unvegetated five hundred (500) foot setback or two hundred (200) foot vegetated setback from the adjoining property line. A two hundred (200) foot minimum setback shall consist of seventy-five (75) foot of vegetated buffer area, measured along the entire portion of the property line abutting said use, and such buffer shall extend an additional one hundred (100) feet in each direction along the common property line. The seventy-five
(75) foot vegetated buffer shall meet the screening requirements contained in Section 8.2.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.