Appendix A - ZONING / Article VI - SUPPLEMENTARY REGULATIONS

Sec. 6.220. Tree protection.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. Purpose and intent. The purposes and intent of the following tree protection requirements are to:

(1) Provide standards for the preservation of trees as part of the land development process;

(2) Protect trees during construction and land development whenever possible in order to enhance the aesthetic appeal and quality of life within the City of Grovetown;

(3) Protect specimen trees while providing for reasonable use of land; and

(4) Promote environmental quality.

b. Applicability.

(1) The tree protection requirements of this section apply to any activity that requires a development permit, except as specifically exempted in section 6.220(c).

(2) The tree removal and maintenance requirements of this section apply to all properties within the city's jurisdiction, except as specifically exempted in section 6.220(c).

(3) No land disturbance permit may be issued until it is determined that the proposed development conforms to the tree protection requirements of this section.

(4) The minimum tree density requirements of sections 6.220(h) and (i) shall apply to new residential development, new non-residential construction and development, and expansion or renovation of existing non-residential development exceeding seventy-five (75) percent or greater of the market value of the site and improvements.

c. Exemptions. The following activities are exempt from the provisions of this section:

(1) The removal of trees from any lot which contains or is zoned and platted or to be platted for purposes of constructing an individual detached single-family dwelling.

(2) The removal of trees from horticultural properties such as farms, nurseries, or orchards.

(3) The removal of trees from a site maintained for ongoing timbering activity. A land disturbance permit will not be issued for a period of three (3) years following tree removal.

(4) The removal of trees by a utility company within dedicated utility easements, where necessary to install, remove, repair, or maintain utilities within the easement.

(5) The removal of trees on public rights-of-way by or on behalf of any federal, state, county, municipal, or other government agency with jurisdiction, where necessary to lawfully construct, maintain, repair, or improve public rights-of-way.

(6) The removal of trees from stormwater detention ponds and drainage easements where necessary for the construction, maintenance, or operation of detention ponds or drainage improvements within drainage easements.

(7) The removal of any tree which has become or threatens to become a danger to human life or property or is diseased and dying, as determined by a qualified tree inspector and approved by the director.

d. Site grading. Clearance of trees and vegetation during the land development process shall be limited to areas necessary for and directly related to the construction of improvements, including buildings, roads, related structures, stockpile staging areas, and material storage areas, or other areas specifically authorized by the approved land disturbance permit.

e. Tree protection survey and plan.

(1) Tree survey required.

a. Survey required. A tree survey must be submitted to the director before the commencement of any alteration, defoliation, or land disturbing activity that requires the issuance of a land disturbance permit or a preliminary plat.

b. Survey requirements. The tree survey must be in the form of a map drawn to scale or a site plan prepared and sealed by a registered land surveyor, registered professional engineer, registered landscape architect, an arborist certified by the International Society of Arboriculture, or a registered forester.

c. Natural features. Important natural features such as streams, stream buffers, and wetlands must be shown on the tree survey.

d. Specimen trees. All specimen trees, defined as deciduous and evergreen hardwood trees sixteen (16) inch caliper and larger and all pine varieties twenty (20) inch caliper and larger, and their critical root zones and drip lines must be labeled and must be shown on the tree survey and inventoried by size and species. This includes specimen trees to be preserved as well as those proposed for removal.

e. Other trees to be retained. All other trees to be counted toward meeting tree density unit requirements must be shown on the survey and inventoried by size and species. Only trees of three (3) inch caliper or greater are eligible for tree density unit compliance purposes.

Trees to be retained must be designated as tree save areas, including their drip line and critical root zones.

f. Trees to be removed. Trees other than specimen trees that are proposed to be removed are not required to be counted and shown individually on the tree survey. Such trees may be estimated in number, size, and species and quantified as part of the total site inventory of tree population.

g. Sampling. Sampling methods may be used to determine tree densities for forested areas over two (2) acres.

h. Tree-save areas. All tree-save areas must be delineated on the tree survey. All buffers with existing trees must be delineated as tree-save areas. Land disturbance within any buffer must be approved by the director.

i. List and tree density unit calculations. The tree survey must provide an accurate list of trees to be saved and their tree density units.

(2) Tree protection plan required. Before commencement of any alteration, defoliation, or land disturbing activity which requires the issuance of a land disturbance permit, a tree protection plan must be submitted to the city for approval.

(3) Tree protection plan specifications. A tree protection plan is a detailed plan designed to protect and preserve trees before, during, and for a period of two (2) years after issuance of a final certificate of occupancy, including the following:

a. Separate drawing. The tree protection plan must be submitted as a separate drawing unless the director approves a combination of tree protection plan with a tree replacement plan on a single drawing.

b. Boundary survey. The tree protection plan must be submitted on a current boundary survey of the proposed site, drawn to scale, and must clearly show all required information.

c. Tract identification. The plan must identify the tract of land involved by acreage and location.

d. Owner and contact. The name, address, and phone number of the owner of the land and the name, address, and phone number of any tenant of the property, and 24-hour emergency contact phone number.

e. Trees to be protected. The type, location, and size in caliper inches of all trees to be protected. Only trees designated on the approved tree protection plan will be counted toward meeting the minimum required tree density requirements.

f. Specimen trees. Location, species, size, critical root zone, and drip line for specimen trees proposed to be protected or removed. Where a critical root zone or drip line for a tree on abutting property is proposed to be protected, it must be included in the tree protection plan.

g. Tree save areas and clearing limits. All natural areas to be retained and buffers must be included in a tree save area.

h. Tree protection methods. Methods of tree protection for all tree save areas, including tree fencing, erosion control, retaining walls, tunneling for utilities, aeration systems, transplanting, staking, signage, geoweb or similar material, permeable paving, bollards, and similar methods, must be included in the tree protection plan.

i. Development characteristics. The plan must identify the location of roads, existing and proposed structures, paving, driveways, cut and fill areas, drainage before and after construction, including detention areas, and similar aspects of the proposed project that may affect tree protection.

j. Utilities and easements. The plan must include the location of all existing and proposed utility lines or easements, including the location of any boring sites for underground utilities.

k. Tree density units. Calculations showing the trees to be retained to meet minimum required tree density units must be included in the plan.

l. Irrigation systems. The tree protection plan must indicate any irrigation systems.

m. Additional information. Additional information may be required on a case-by-case basis by the director.

(4) As part of a tree protection plan, the director of planning and community development may require relocation or replacement of trees as uniformly as possible throughout the site. The director of planning and community development may also require the use of active tree protection fencing for any or all tree save areas.

f. Tree removal.

(1) Applicability.

a. The removal provisions apply to any person removing trees, as well as any person removing trees on behalf of any other person, including all tree removal companies, utility companies, or persons in the business of removing trees or construction.

b. It is unlawful for any person or company to remove any tree or undertake any work for which a land disturbance permit is required unless a valid permit is in effect and displayed on the site.

c. Utility companies may conduct emergency work without formal approval; provided, however, that emergency actions are reported in writing to the director within three (3) working days after completion of all emergency services. Further, the permit taken by any person, company, or utility may include defined areas of tree cutting and trimming under one permit.

(2) Removal of specimen trees. No specimen tree may be removed unless in accordance with the following requirements.

a. Justification for removal. Any applicant proposing to remove a specimen tree must apply for a tree removal permit. In addition to the requirements for tree removal permits, the applicant must provide a written explanation as to why the specimen tree cannot be retained on the site. This description must include a description of alternative site plans considered to avoid the removal of the specimen tree. The written explanation must at a minimum include the following:

1. Consideration of whether any buildings or structures, parking areas, stormwater facilities, utilities, driveways, or other features of the proposed development can be relocated or designed to retain the specimen tree, and the additional costs of redesign, if any.

2. Consideration of whether the land area consumed by the proposed development can be reduced via parking structures, reduction of the building footprint by increasing the building height, placement of stormwater facilities underground, and other appropriate means to retain the specimen tree, and the additional costs involved in the surface area modifications, if any.

b. Director of planning and community development approval. The director will approve or deny the application to remove a specimen tree, after review and recommendation from a certified arborist. The director may issue a permit to remove one or more specimen trees after finding that one or more of the following conditions are met:

1. The written analysis provides convincing evidence that alternative site and building designs have been considered by the applicant, but would not result in retention of the specimen tree.

2. The additional cost associated with developing the site or constructing buildings as redesigned or reducing the site area consumed to retain one or more specimen trees would be disproportional to the value of the specimen tree retained, calculated at one hundred dollars ($100.00) per tree density unit.

3. Where more than one specimen tree is proposed to be removed, the site design results in the minimum number of specimen trees removed that are necessary to accommodate the proposed development.

4. The request to remove one or more specimen trees is reasonable considering the remaining specimen trees on the site that will be retained.

5. A variance to the dimensional requirements of the zoning district may be an appropriate remedy to preserve a specimen tree. Where, in the opinion of the director, one or more variances would enable a site and building design to be accomplished while saving one or more specimen trees, and where the objectives of tree protection would outweigh the purposes of the dimensional requirements that would be varied, the director may suggest an applicant apply for variances instead of proposing to remove one or more specimen trees. A determination by the director that one or more variances to the dimensional requirements would not be appropriate may support a finding by the director in favor of granting approval to remove one or more specimen trees.

(3) Removal of non-specimen trees.

a. Removal of non-specimen trees from a site may be allowed at the discretion of the director when:

1. The tree is located in an area where a structure or improvement will be placed, and the tree cannot by relocated on the site because of age, species, or size;

2. The tree is in an irreversible state of decline, or is structurally unsound and has been rated as a high risk tree by a qualified tree risk assessor;

3. The tree is injured or poses an imminent danger, or has been rated as a high risk tree by a qualified tree risk assessor;

4. The tree interferes with existing utility service; or

5. The tree creates an unsafe visual obstruction for vehicular movement.

(4) Site clean-up required. All tree removal companies, utility companies, or persons in the business of construction or removing trees must remove from the site any trees, stumps, limbs, or debris caused by tree removal activities.

g. Variances and appeals.

(1) Applicants with a hardship imposed by the standards for tree protection may seek a variance from the standards pursuant to Article X.

(2) Applicants dissatisfied with a staff decision regarding tree protection may appeal the decision to the board of zoning appeals pursuant to Article X.

h. Minimum tree density.

(1) Minimum. All sites subject to the tree protection requirements must maintain a minimum tree density, measured in units per acre. The term "unit" is an expression of basal area, and is not synonymous with "tree." The tree density requirement must be met whether or not a site has trees prior to development.

(2) Required tree density units. Tree density units required vary based on the type of development.

See table below.

Type of Development Tree Density Units Required Per Acre Professional, Commercial, Industrial 15 Residential 20

(3) Methods of achievement. The minimum required tree unit density may be achieved by protecting existing trees and by planting new trees on the site.

(4) Calculation of existing tree density. Required tree density units are calculated on the basis of total (gross) area of the site or lot in question, excluding existing easements that are required to be cleared of trees. Only existing trees of not less than three (3) inches diameter at breast height (DBH) left in good growing condition and protected in tree save areas on the site count toward the minimum required tree density units. Protected trees are eligible for tree density credit based on the following table.

Existing Tree Size (DBH) Tree Density Units 3" 1.0 4" 1.25 5" 1.75 6" 2.0 8" 2.5 10" 3.0 12" 3.75 14" 4.2 16" 5.0 18" 5.2 20" 5.5 22" 5.8 24" 6.3 26" 6.6 28" 6.9 30" 7.2 32" 7.5 34" 7.8 36" 8.1 38" 8.4 40" 8.7 Existing Tree Size (DBH) Tree Density Units 42" 9.0 44" 9.3 46" 9.6 48" 9.9 50" or more 10.5

i. Tree replacement.

(1) Tree replacement plan. Trees must be relocated or replaced on site. As many trees as can reasonably be expected to survive must be planted on the site. This provision may require planting less trees of a larger caliper than the minimum required caliper. Tree selection and planting shall meet ANSI A300 and Z60.1 standards.

a. Separate drawing. A separate tree replacement plan indicating the location of all proposed trees for revegetation is required. This plan must be submitted as a separate drawing, but with the director's approval, may be included as a part of the tree protection plan.

b. Planting schedules and species names. The tree replacement plan must include planting schedules with proposed trees species names (botanical and common), quantity, size, spacing, and any special planting notes.

c. Overstory/understory ratio. Replanting must be at a ratio of not less than one overstory tree for every three (3) understory trees. Tree density credit may be met by planting all overstory trees, but not by planting only understory trees.

d. Diversity. No more than forty (40) percent of any one genus may be included in any replanting plan. Exceptions to this requirement may be authorized by the director.

e. Approved trees. Unless otherwise approved by the director, trees selected for replanting must be on the tree species selection list in section 6.230. Invasive trees are not allowed under any circumstances. Trees selected must be free from injury, pests, disease, nutritional disorders, or root defects, and must be in good vigor in order to assure a reasonable expectation of survival. It is desirable that replanted trees be ecologically compatible with the site and neighboring sites. Accordingly, replanted trees must be of the same or similar species as those removed, when practical.

f. Flowering ornamental trees. The use of flowering ornamental trees or plants classified as large shrubs may be included in the tree replacement plan, but may not be used for the purpose of meeting minimum tree density unit requirements for the site, unless approved by the director.

g. Transplanting trees. Standards for transplanting must be in keeping with those established in the latest edition of ANSI A300 (Part 6), and described in the published Best Management Practices: Tree Planting, developed by the International Society of Arboriculture.

h. Planting and staking details. Planting and staking details must be provided on the tree replacement plan using International Society of Arboriculture standards.

i. Practices. The city encourages environmentally sustainable design practices such as drought-tolerant landscaping, keeping turf away from native trees, and planting trees strategically for energy conservation.

j. Debris. All debris from trees cut or substantially damaged must be removed from the site or chipped in a timely fashion, including the removal or chipping of any portion of the tree stump above the original natural grade or elevation of land.

(2) Calculation of replacement tree density. Newly planted trees are eligible for tree density credit based on the following table. Replacement trees may include street trees planted in public rights-of-way, either adjacent to or within the site.

Replacement Tree Size (caliper) Tree Density Units 2" (understory only) 1.0 3" 1.0 4" 1.2 5" 2.1.7 6" 2.6 7" 3.5 8" 4.3 9" or more 6.0

a. A seven-gallon container-grown pine tree is given replacement credit of 0.5 units.

b. For tree relocation, replacement units will be granted to trees relocated on site. Tree relocation is subject to approval by the director.

(3) Replacement tree size and height.

a. All replanted overstory trees must be a minimum of eight (8) feet tall and have a trunk of not less than three (3) caliper inches.

b. All replanted understory trees must be a minimum of six (6) feet tall and have a trunk of not less than two (2) caliper inches.

(4) Minimum root zone.

a. In order to provide sufficient growing area for planted trees, the following minimum criteria must be observed unless otherwise approved by the director:

1. Overstory tree: Two hundred (200) square feet of pervious root zone.

2. Understory tree: Seventy-five (75) square feet of pervious root zone.

b. Impervious surface area may encroach into no more than thirty (30) percent of the pervious root zone of a tree to be protected or planted, with techniques approved by the director.

(5) Permit. No land disturbance permit may be issued until the director has approved the tree replacement plan.

(6) Maintenance. All replacement trees must be maintained properly to ensure their survival.

(7) Cut or filled slopes. Cut or filled slopes within residential developments and outside of building lots shall be replanted with evergreen trees at a rate of twenty (20) tree density units per acre, independent of the tree density requirement for the overall development. Trees planted to meet this requirement may be counted toward the tree density requirement for the overall development.

j. Tree protection during construction.

(1) Materials prohibited in tree save areas. No structure, improvement, or other activity, including solvents, material, construction machinery, portable toilets, construction trailers, or temporary soil deposits may encroach or be placed within a drip line or within six (6) feet of the area immediately outside the drip line of any specimen tree or any tree within a tree save area.

(2) Tree protection devices. Before land disturbance, the developer is required to erect suitable protective barriers pursuant to an approved tree protection plan, including tree fences, tree protection signs, and erosion barriers. City inspection of tree protection barriers is required prior to the commencement of any land disturbance or development. Tree protection measures must remain in functioning condition until completion of site landscaping, completion of the project, or until the certificate of occupancy is issued. Authorization to remove the protective devices must be evidenced by approval in writing by the director or issuance of a final certificate of occupancy.

(3) Active tree protection devices. Materials for active tree protection must consist of chain link, wooden post and rail fencing, or other equivalent restraining material. In addition to fencing, where active tree protection is required, each tree to be saved must be marked at the base of the trunk with blue colored water-based paint.

(4) Passive tree protection. Passive tree protection fencing is to be used only for areas remote from construction activity. Materials for passive tree protection must consist of orange laminated plastic or heavy plastic flagging, a minimum of four (4) inches wide with dark letters reading "Tree Protection Area—Do Not Enter" or equivalent signage on a continuous durable restraint.

(5) Additional measures. The developer must take measures to ensure the health of protected trees during construction, including, but not limited to:

a. Water, fertilize, and treat the trees for pests or disease, as needed, in accordance with standards of the International Society of Arboriculture.

b. Where grading covers the trees with dust, hose them off.

c. Do not prune branches so that equipment or structures "fit" within the trees' protected zone.

d. Do not strip the topsoil or remove the natural leaf mulch or material from beneath a protected tree.

e. Trees should be felled away from, rather than into, tree save areas.

f. Provide adequate mulching and water for trees that will be retained.

(6) Tree damage. Any tree designated on a tree protection plan to be saved that is damaged during construction or as a result of construction, must be treated according to accepted standards, or replaced with trees equal to the tree density unit value of the tree removed or damaged. Any specimen tree removed or damaged must be replaced with twice the tree density unit value of the tree removed or damaged. Where a damaged specimen tree must be removed, the area occupied by its drip line must remain in a pervious state. A replacement plan must be approved by the director.

k. Tree maintenance.

(1) To prevent long-term harm to the health of trees or their structure, all pruning of trees within the city must be done in accordance with ANSI A300 Tree, Shrub, and Other Woody Plant Management Standard Practices (Pruning).

(2) On a single lot that contains or is zoned and platted for purposes of constructing a detached or attached house, tree maintenance requirements only apply to specimen trees.

(3) "Topping," defined as reduction of tree size using intermodal cuts without regard to tree health or structural integrity, is prohibited.

(4) Required tree density must be maintained on the site in perpetuity. Replacement of damaged or diseased trees shall meet the requirements of this section.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:grovetown/zoning/6.220@2026-11-11-831d4f32e4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Grovetown Zoning Ordinance, Sec. 6.220. Tree protection | Georgia Commons