Guyton · Ordenanza de zonificación
Appendix B - ZONING / Article X - ENFORCEMENT AND ADMINISTRATION
Sec. 1001. Planning and zoning director.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. All provisions of this ordinance shall be enforced and administered by the Planning and Zoning Director(s) or such persons designated by the City Council.
B. The duties and powers of the Planning and Zoning Director shall be:
(1) To receive and check all applications for building and sign permits, certificates of occupancy, and certificates of appropriateness:
(a) Prior to issuance of any building permit, the Planning and Zoning Director shall ensure that the building structures or use proposed conforms in all respects to the provisions of this zoning ordinance and other applicable regulations (See Section 1002);
(b) Prior to issuance of a certificate of occupancy, the Planning and Zoning Director shall determine that the work completed is in accordance with all provisions of this zoning ordinance and other applicable regulations (See Section 1003);
(c) For new developments proposed with the city which meet or exceed the minimum thresholds identified in the Department of Community Appraiser Procedures and Guidelines for the Review of Developments of Regional Impact (DRI), the city will comply with these intergovernmental review procedures. The city shall be allowed up to a maximum of thirty (30) days to complete the review process for large development projects that are likely to create impacts in other local jurisdictions. The city will not take any official action to further any such developments until the DRI review Process is completed or a maximum of thirty (30) days has transpired from the date the completed DRI Request for Review Form was forwarded to the Coastal Regional Commission.
(2) To require any information necessary to determine the conformity of the application with the regulations of this ordinance and building codes. This information may include:
(a) Proposed uses of building, structure, or land;
(b) Placement of the building or structure on the lot;
(c) Size, dimensions or other characteristics of the building, structure, and the lot itself;
(d) Placement, size, and number of signs;
(e) Number, size and location of parking and unloading spaces;
(f) Any other relevant information under this ordinance (such as access points).
(3) To inspect premises of applicant's property, building or structure.
(4) To issue the building permit or certificate of occupancy after compliance with this zoning ordinance and other applicable regulations are established.
(5) To notify any person responsible for violating the provisions of this ordinance and to order the action necessary to correct the violation. He shall order:
(a) Discontinuance of illegal use of land, buildings, or structures;
(b) Removal of illegal buildings or structures;
(c) Discontinue of any illegal work being done.
(6) To issue temporary permits, provided that the permit includes necessary safeguards for the public safety, health, and welfare. (See Section 1004.)
(7) To inform the applicant of a building permit if his/her proposed use, building or structure is designated as a Special Permit Use and to advise said applicant of the procedure necessary to acquire this permit.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.