Hall County · Ordenanza de zonificación
Appendix A - UNIFIED DEVELOPMENT CODE / 4.8 - Conservation Subdivision (CS)
4.8.6. Application Requirements
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. Site Analysis Map Concurrent with the submission of a preliminary plat, the applicant must prepare and submit a site analysis map to ensure that the important site features have been adequately identified prior to the creation of the site design and that the proposed open space will meet the
requirements of this UDC. The site analysis map must include the following information:
1. Property boundaries.
2. All streams, rivers, lakes, wetlands and other hydrologic features.
3. Topographic contours of no less than five-feet intervals for hilly terrain (slopes greater than ten percent), two feet intervals for rolling terrain (two percent to ten percent), and one foot for flat terrain (slopes less than two percent) as referenced in the Hall County, Georgia subdivision regulations.
4. All primary and secondary conservation areas labeled by type, as described in Sec. 4.8.7.A.
5. General vegetation characteristics.
6. General soil types.
7. The planned location of protected open space.
8. Existing roads and structures.
9. Potential connections with existing greenspace and trails.
B. Other Requirements The applicant must adhere to all other applicable requirements of the underlying zoning district, the Hall County Subdivision Regulations in Article 9, and all other applicable provisions of the
Official Code of Hall County, Georgia.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.