Sec. 1117. Road development directives.
Sobre este texto
- As published by Municode, current through 2023-12-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
In order for the Board of Commissioners to accept any streets/roads within Harris County, the following directives shall be complied with:
(a) The subdivider/owner/developer of proposed streets/roads shall acquire a copy of this article. A copy may be obtained from the following County departments:
Public Works Department, Community Development Department, or the County Manager's office, from 8:00 a.m. to 12:00 noon and from 1:00 p.m. to 5:00 p.m.,
Monday through Friday.
(b) Prior to beginning construction on a street/ road, following preliminary plat approval, the subdivider/owner/developer shall
consult with the Public Works Director and submit a set of construction plans.
Said plans will be reviewed for compliance; following approval, subdivider/ owner/developer may proceed with
construction of street/road. No construction will be started until the construction plans have been approved.
(c) After the subdivider/owner/developer has completed construction of said streets/
roads to include striping and the placement of all signs (stop, curve, street signs, etc.), he/she shall forward a letter requesting an inspection by the Public
Works Director.
(d) Upon receipt of said request, the Public Works Director or his designee shall
conduct an inspection of said streets/ roads for compliance with the approved construction plans and the road standards contained within this article.
(e) Initial Inspection Report.
(1) After the inspection has been accomplished, the Public Works Director shall complete an inspection report and forward the original to the Board of Commissioners office
and a copy to the subdivider/owner/ developer. This report will indicate any deficiencies noted and what the subdivider/owner/developer must correct/complete prior to the recommendation of acceptance by the Public Works Director. If there are
no deficiencies, the report will indicate as such and the Public Works Director will recommend that said streets/roads be accepted and placed on the official Harris County Road Register.
(f) After receipt of the successful inspection report, the subdivider/owner/developer
shall forward the following to the Board of Commissioners:
(1) A 4-year guarantee in the form of a cost bond, letter of credit, or certified check, effective for4 years from the date of the successful inspection, in the amount of 5% of the cost of the road work done, to include
drainage system, base, and paving, accompanied by a copy of the contractor's invoices for said road work. If a cost bond is provided, it must be held by a company must be licensed to do business in Georgia.
(2) A deed conveying said street/road and right-of-way to Harris County, Georgia.
(3) A copy of the recorded plat referenced in the right-of-way deed.
(4) A document showing the map and parcel numbers of the property being deeded.
(5) A check made payable to Harris County Clerk of Superior Court to cover the cost of recording the deed.
(6) A document showing the name and contact information of the person to whom the request for the actual title policy is to be sent and to whom copies of the recorded documents are to be sent.
(7) A commitment policy of owner's title insurance to the Board of Commissioners insuring, except for title insurance standard exceptions, the
fee simple title to the street/road being accepted by the Board of Commissioners and dedicated to public use.
Such title insurance shall be in the amount of the cost of the road to include drainage system, base and paving. The premium for the aforementioned title insurance shall be borne by the subdivider/owner/ developer of the property. The requirement for title insurance shall be a pre-requisite to the acceptance of the road by the Board of Commissioners.
(g) Following receipt of all required documents, a resolution for acceptance regarding the streets/roads will be prepared for consideration by the Board of Commissioners.
(h) Following adoption of the resolution, the deed shall be recorded, and copies of the resolution and the recorded deed will be provided to the subdivider/owner/
developer upon receipt of the owner's title insurance policy, which replaces the commitment policy submitted with the
road acceptance documents.
(i) Six months prior to expiration of the bond, letter of credit, or certified check, the Public Works Director or his designee shall conduct a final inspection of said streets/roads.
(j) Final inspection report.
(1) After the final inspection has been accomplished, the Public Works Director shall complete a final inspection report and forward the original to the Board of Commissioners and a copy to the subdivider/ owner/developer. This report will
indicate any deficiencies noted and what the contractor must correct/ complete to bring the road into compliance with the County's standards for new road construction.
(2) If the street/road does not meet standards within 60 days, the subdivider/owner/developer's bond or letter of credit will be called in, or the cash bond utilized, to accomplish required corrections.
(3) If there are no deficiencies, the report will so indicate and at the end of the
four-year guarantee period, the bond, letter of credit, or a check in the amount of the original certified check shall be returned to the subdivider/ owner/developer.
(k) Guarantees.
(1) In the event a subdivision is developed in two or more phases, at the beginning of street/road development in each phase the subdivider/ owner/developer must first furnish/
post a surety bond, letter of credit, or certified check to the Board of Commissioners to guarantee existing county roads in the subdivision against damage directly attributable and caused by heavy truck traffic in the delivery of building
materials and equipment in the construction of new structures within the subdivision.
(2) Said bond, letter of credit, or certified check shall be in the amount of 75 percent of the cost to pave the
existing road, with each succeeding year to remain the same until the development is 90 percent completed and if any repairs are required as a result of damage by heavy equipment, the developer will be billed for 75 percent of the repair costs in
the form of a report of damage along with a list of repairs which must be accomplished.
(3) If payment is not made to the County within 60 days, the subdivider/owner/
developer will not be issued additional building permits for the subject subdivision until restitution is made.
(4) It shall be the responsibility of the subdivider/owner/developer to notify
the Board of Commissioners when the development is 90 percent complete, and upon verification of same by the appropriate county department, if the bond or letter of credit have not been called in, or the certified check not utilized for repairs, the bond or letter of credit, or a check in the amount of the original certified check shall be returned to the subdivider/owner/ developer.