Ir al contenido
Georgia Commons
Menú

Harris County · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE / Article 11 - PROCEDURES AND PERMITS / Division 6 - APPEALS

1137.02. Floodplain management variance

Sobre este texto

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

procedures.

The following variance procedures apply specifically to the floodplain management provisions of this article.

(a) The Board of Commissioners shall hear and decide requests for appeals or variance from the requirements of this article.

(b) The Board of Commissioners shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the building inspection director in the enforcement or administration of this article.

(c) Any person aggrieved by the decision of the Board of Commissioners may appeal such decision to the Superior Court of Harris County, as provided in O.C.G.A.

§ 5-4-1.

(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.

(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable

alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.

(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.

(g) In reviewing such requests, the Board of Commissioners shall consider all technical evaluations, relevant factors, and all standards specified in this and other

sections of this article.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:harris-county/zoning/1137.02@2023-12-05-0fe7821143

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Harris County Zoning Ordinance, 1137.02. Floodplain management variance | Georgia Commons