The applicant, zoning administrator, planning commission and city council should review applications for conditional uses with regard to the following criteria:
(1) Off-street parking and loading facilities are adequate in terms of location, amount and
design to serve the use.
(2) The number, size and type of signs proposed are compatible with the surrounding area.
(3) The amount and location of open space and the provision of screening is such that buffering of incompatible uses is achieved.
(4) Ingress and egress to the property is suitable and safe, and the effect of the proposed activity on traffic flow along adjoining
streets is not adverse.
(5) The location and intensity of outdoor lighting is such that it does not cast light on adjacent, adjoining or neighboring properties.
(6) Hours and manner of operation of the proposed use are not inconsistent with adjacent and nearby uses.
(7) Public facilities and utilities are capable of adequately serving the proposed use.
(8) The proposed use will not have a significant adverse effect on the level of property values or the general character of adjacent land uses or the general area.
(9) The physical conditions of the site, including size, shape, topography and drainage, are suitable for the proposed development.
(10) The proposed use is consistent with the goals and objectives of the city's comprehensive plan.
(11) The proposed use and development are compatible with adjacent and nearby uses and buildings in terms of density and scale of development.
(12) Applications for proposed conditional uses in Heavy Industrial (M-2) Districts shall be considered and evaluated with regard to the foregoing criteria in this section and also with regard to the following additional criteria and after complying with the following requirements:
a. The applicant shall obtain, at the applicant's expense, and present to the administrator with the application, building plans and specifications for the proposed data mining center. The plans and specifications
shall contain and include sufficient detail with regard to materials, structures, dimensions, and digital machinery and equipment so that an acoustic engineer or other qualified acoustic professional can prepare a noise remediation study that accurately and realistically predicts the noise levels likely to be produced in surrounding areas from the specific intended use.
b. The applicant must obtain, at the applicant's expense, from an acoustic engineer or other qualified acoustic professional, a preconstruction noise remediation study or evaluation of the conditional use based on the actual building plans and specifications of the intended use. The study or evaluation shall be based on details of the plans and specifications submitted by
the applicant. The study shall include such analysis as is reasonably necessary to support its conclusions.
c. The study must establish that, based on the plans and specifications of the intended use, any noise at the site shall be reduced to a suitable level for surrounding residential areas, less than 60Db.
d. Any recommendations of the acoustic engineer or other qualified acoustic professional as to materials, structures, methods, or other matters that are necessary or appropriate to reduce noise at the site to less than 60Db shall be incorporated into the applicant's building plans and specification.
e. Any construction or other process that is, in the opinion of the acoustic engineer or other qualified acoustic professional, necessary or appropriate to reduce noise at the site to less than 60Db, and is so stated in the
study, shall be completed before issuing a Certification of Occupancy (CO) or business license.
f. The city shall have the right to reject the conclusions of the applicant's acoustic engineer or other qualified acoustic professional if the reasoning or conclusions appear to be flawed or not well grounded in the specific facts of the intended use.
The zoning administrator, planning commission and city may consider other factors deemed relevant before formulating recommendations and taking
action on a particular conditional use application.
Historia
(Ord. of 10-2-1995, § 86-1908; Ord. No. 2022-03, § 4, 6-1-2020)