Ir al contenido
Georgia Commons
Menú

Hawkinsville · Ordenanza de zonificación

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 8 - BUILDING CONSTRUCTION

Sec. 6.8.1. Building permit.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A building permit issued by the Building Inspector is required in advance of the initiation of construction, erection, moving or alteration of any building or structure where the estimated cost of such construction, erection, moving, or alteration will be in excess of three hundred dollars ($300.00). All structures shall comply with the requirements of this ordinance, whether or not a building permit is required.

a. Procedure for approval. The Building Inspector shall be responsible for administering and enforcing the City's building code. The applicant shall be responsible for obtaining approval of the State Fire Marshall, as applicable.

(1) Prior to issuance of a building permit the owner shall have received a development permit if required by this ordinance.

(2) Application for a building permit shall be made to the Building Inspector. The application shall include:

(a) Application on the form furnished by the Building Inspector, requesting issuance of a building permit.

(b) Three (3) sets of the building plans for principal multi-family or nonresidential buildings prepared in conformance with this ordinance and the applicable building codes. Plans shall be prepared by or under the supervision of, or reviewed and approved by, an architect registered in Georgia, who shall sign and seal each sheet in the original set of drawings.

(c) County Health Department Approval if an on-site sewage disposal system has been allowed by the Board of Commissioners.

(d) Payment of the building permit application and review fee.

(e) Payment of the water and sewer tap fees.

(3) The application will be checked by the Building Inspector for completeness at the time of submission. Incomplete applications will be returned to the applicant.

(4) Within two (2) weeks following receipt of a complete application, the Building Inspector shall indicate on one copy of the building plans or in writing all comments related to compliance of the building plans with this ordinance, applicable building codes, and any conditions of zoning approval.

(5) The owner shall be responsible for compliance with this ordinance and all building code requirements, regulations, and for the satisfaction of all of the comments of the Building Inspector.

(6) A street address number shall be assigned prior to issuance of a building permit.

(7) At such time as the owner has addressed the comments to the satisfaction of the Building Inspector and the State Fire Marshall, a building permit shall be issued for the structure.

(8) Plumbing, electrical and mechanical permits shall be issued separately by the Building Inspector or separately identified on the building permit. Such permits must be issued prior to commencement of work by each affected trade.

b. Standards for approval.

(1) Building permits shall only be issued on buildable lots of record, as defined in this ordinance.

(2) Building permits shall be issued in conformance with the technical codes adopted and amended by the City under Section 5-2 of its Code of Ordinances.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 5-10-96)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hawkinsville/zoning/6.8.1@2026-11-11-da20f86805

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hawkinsville Zoning Ordinance, Sec. 6.8.1. Building permit | Georgia Commons