Ir al contenido
Georgia Commons
Menú

Heard County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 46 - ZONING / Article IX - COMMUNICATION TOWER REGULATIONS

Sec. 46-251. General requirements for wireless communication facilities.

Sobre este texto

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Generally, a special land use permit shall be required for all television, land mobile, communication, microwave, radio transmission antennas and towers, or any other type of wireless communication tower antenna or other wireless communication facility as those terms are defined in this article.

(b) Requirements for a special use permit are as follows:

(1) A special land use permit granted by the board of commissioners is required for all proposed wireless communication facilities. Wireless communication facilities utilizing alternative structures that include, but are not limited to, simulated trees, clock towers, bell steeples, light standards, and similar alternative mounting structures that are deemed appropriate for a specific site may be granted approval in any zoning district. special land use permits for monopole towers will only be considered in the industrial (I), the general commercial (GC), the agricultural (A-1) and the rural development (RD) zoning districts and special land use permits for latticed-framed towers will only be considered in the industrial (I) zoning district, pursuant to those additional restrictions listed herein.

(2) A special land use permit granted by the board of commissioners shall be required for the construction of all new wireless communication facilities within the county after the following factors are considered:

a. The environment surrounding the proposed site in relation to the proposed design of the facility.

b. The proposed height of any component of the facility in relation to the height of buildings, trees or other structures in the area.

c. Proximity to residential structures and residential district boundaries.

d. Nature of uses on adjacent and nearby properties.

e. Surrounding topography, tree coverage and foliage.

f. Architectural design of the components of the facility, with particular reference to the aesthetics of design characteristics that have the effect of virtually eliminating visual obtrusiveness.

1. Towers shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA, be painted a neutral color, so as to reduce visual obtrusiveness.

2. At a tower site, the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening and landscaping which will blend the tower facilities to the natural setting and built environment.

3. If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color or colors that is identical to, or is closely comparable with, the supporting structure and/or surrounding area so as to make the antenna and related equipment as visually unobtrusive as possible.

4. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority.

5. If lighting is required, the county commission may review the available lighting alternatives and approve the design which would cause the least disturbance to the surrounding views.

6. In addition, all such towers and antennas shall be designed to minimize visual and scenic impact when located on slopes greater than 15 percent or on top of such slopes.

g. Proposed landscaping necessary to ensure that the visual obtrusiveness of all accessory structures will be virtually eliminated.

h. Proximity to historic districts.

i. Historic and/or scenic views, when monopole or lattice-framed towers are proposed.

(3) At the time of filing the application for a special land use permit for a wireless communication facility, the applicant shall provide a survey, including a written legal description, site plan and information regarding the facility as described as follows:

a. A scaled site plan that clearly indicates the proposed location, type and height of the proposed facility and all accessory structures.

b. Current zoning and existing land use of the subject property.

c. Zoning and land use of adjacent properties, including proximity to historic or scenic areas.

d. Elevation drawings of the proposed facility.

e. Proposed landscape plan.

(4) All permit applications submitted to the department of planning and zoning shall include a complete inventory of the applicant's existing facilities, towers and receivers/transmitters located within the county including each asset's location, height and collocation usage or capabilities, as well as the nature of any alternative structures being utilized. The department of planning and zoning shall utilize such information to promote collocation alternatives for other applicants, when deemed appropriate.

(5) All permit applications must demonstrate that equipment enclosures and other improvements accessory to a wireless communication facility shall be architecturally designed to blend in with the surrounding environment and shall be maintained in good appearance and repair. The county may require landscaping to be included to help conceal these enclosures. Accessory structures shall be limited to usages associated with operation of the antennae or towers and shall be appropriate in scale and intensity. All towers and antennas shall be equipped with an anti-climbing device as a six-foot wall, fence or other appropriate devices to prevent unauthorized access.

(6) Generators shall not be used as a primary electrical power source. Backup generators shall only be operated during power outages or for testing and maintenance purposes. Testing and maintenance shall only take place on weekdays between the hours of 8:30 a.m. and 4:30 p.m.

(7) In those instances where a monopole or lattice-framed tower is proposed, all applicants must demonstrate that no existing tower, or structure can accommodate the proposed antennas. Evidence of an engineering nature shall be documented by the submission of a certification by a qualified engineer. Such evidence may consist of the following:

a. No existing towers or structures, including water towers, towers associated with high-voltage transmission lines or any other structure with the potential to accommodate such a wireless communication facility, are located within the geographic area required to meet applicant's engineering requirements.

b. No existing structure is of sufficient height to meet the applicant's engineering requirements.

c. No existing tower or structure has sufficient structural strength to support applicant's proposed antennas and related equipment.

d. Applicant's proposed antennas would cause electromagnetic interference with the antennas on the existing tower or structure.

e. The fees or costs required to share the existing tower or structure or to adapt the existing tower or structure for shared use are unreasonable.

Costs exceeding new tower development are presumed unreasonable.

f. Such other limiting factors as may be demonstrated by the applicant.

(8) At the time of filing the application for a wireless communication facility, the applicant shall provide a site plan and information regarding location of accessory structures, neighboring use, proposed architectural design and proposed landscaping. Documentation must be submitted and certified by a qualified engineer delineating coverage and propagation zones, design and collocation capabilities.

(9) In granting a special land use permit, the board of commissioners may impose additional conditions to the extent determined necessary to minimize adverse effects on adjoining properties.

(10) As part of the application, each applicant for a wireless communication facility shall be required to execute a standard maintenance/removal agreement binding the applicant and its successors and assigns to maintain properly the exterior appearance of and ultimately remove the facility upon abandonment or cessation of operations. Such agreement shall require the applicant to pay all costs for monitoring compliance with and enforcement of, the agreement and to reimburse the county for all costs it incurs to perform any work required of the applicant by the agreement that the applicant fails to perform.

(11) A cash bond, or other security acceptable to the county in an adequate amount to cover the cost of the removal of the tower, shall be required in conjunction with the maintenance/removal agreement. This amount shall be $30.00 per foot for the height for monopole towers and $100.00 per foot of height for self supporting or guyed towers. The applicant and its successors and assigns shall be required to continue such bond or other security until such time as the facility has been removed and all other requirements of its maintenance/ removal agreement have been satisfied. Private business users operating a single wireless communication facility at their principal place of business and government users are exempt from the bond requirement. An account shall be established for removal of towers constructed refundable up to the amount of deposit upon restoration of the site to its previous condition as determined by the board of commissioners or to the standard described in the lease agreement.

(12) The county may elect to retain outside consultants or professional services to review an application for any wireless communication facility and to make recommendations on relevant issues including, but not limited to, verification of the applicant's due diligence, analysis of alternatives, conditions of approval and compliance with state and federal rules and regulations, at the applicant's expenses. An application shall not be deemed complete until the applicant has posted a $5,000.00 cash bond, or other security satisfactory to the county guaranteeing payment of such expenses. Private business uses operating a single wireless communication facility at their principal place of business and governmental users are exempt from the bond requirement.

(13) The county reserves the right to conduct a height trial to identify the visual impact of the proposed facility upon the surrounding area.

(14) The following application fees are required with each application:

Alternative wireless communications facilities $500.00 Monopole towers $1,000.00 Latticed-framed towers $1,500.00

(15) All towers and antennas shall be set back according to front yard requirements stated in table 46-251. Towers with trigger links shall be setback five times the full height of the tower if adjoining any property zoned A-1, RD, R-1, MR or

MHP.

(16) At the time of filing the application for a tower, the applicant shall provide a site plan and information regarding topography, coverage zone, and tower height requirements.

(17) Shared usage of towers and antennas facilities is encouraged, and towers shall be designed to accommodate such uses.

(18) Any tower approved under the provisions of this article which is not utilized by any communications service produce for any communications related purpose for a period of 12 consecutive months shall lose any privilege of special use previously granted by the county commission and must therefore be resubmitted for approval prior to use for any purpose not permitted by the existing zoning.

(19) Collocation of antennas.

a. In addition to all applicable building and safety codes, all towers, except amateur radio towers, shall be designed to accommodate the collocation of cellular telecommunications antennas according to table 46-251.

b. Applicants shall be required to use combiners when possible to reduce tower height necessary to separate users. Additional tower height to accommodate additional providers shall not permitted without documentation from a certified engineer that combiners are not a feasible alternative to additional tower height and the basis for that determination.

(20) Setback and buffer requirements.

a. All towers shall comply with the setback and buffer requirements set out in table 46-251.

b. Tower heights shall be measured from the existing ground base level to the highest point on the tower or other structure, even if the highest point is an antenna, in accordance with table 46-251.

c. Variances to the height restrictions set forth in table 46-251 may be requested but shall only be granted upon a showing that the existing topography requires additional height to serve the user at the lowest height location on the tower or an additional user has requested location on the tower and no location is available based in the number of users currently of contracted to be located on the tower. Any variance request will require the applicant to provide a flight path study of all airfields in a three-mile radius of the site and a determination by a qualified expert that the additional height will not interfere with current flight patterns.

Table 46-251: Maximum Telecommunication Tower Heights, Minimum Setbacks From Property Lines, and Buffer Requirements Zoning district Three Users Four or More Users Setbacks Buffer RD rural development 150 feet 4.64 180 feet 4.69 11 /2 15 feet wide, beginning at security fencing A-1 agricultural 150 feet 4.64 180 feet 4.69 11 /2 15 feet wide, beginning at security fencing GC general commercial 150 feet 0.516 200 feet 0.918 Full tower height 15 feet wide, beginning at security fencing I industrial 150 feet 0.516 250 feet 1.43 Full tower height 15 feet wide, beginning at security fencing

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:heard-county/zoning/46-251@2024-07-16-cfdcff62c7

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Heard County Zoning Ordinance, Sec. 46-251. General requirements for wireless communication facilities | Georgia Commons