Ir al contenido
Georgia Commons
Menú

Heard County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 46 - ZONING / Article XV - WATERSHED PROTECTION OVERLAY DISTRICTS

Sec. 46-457. Minimum criteria for large water supply watersheds.

Sobre este texto

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The stream corridors of the perennial tributaries of a large water supply watershed tributary to the water supply intake shall have the following specified minimum criteria:

(1) Corridors. The corridors of all perennial streams in a large water supply watershed tributary to a water supply reservoir within a seven-mile radius of the reservoir boundary are protected by the following criteria:

a. A buffer shall be maintained for a distance of 100 feet on both sides of the stream as measured from the stream banks.

b. After the effective date of this article, no more than 25 percent of the land area of all tract, parcel or lot on which any structure or building is placed may be covered by impervious surface within a one-hundred-fifty-foot setback area on both sides of the stream as measured from the stream banks and the reservoir boundary.

c. Septic tank and septic tank drain fields are prohibited within a onehundred-fifty-foot setback area on both sides of the stream as measured from the stream banks and the reservoir boundary.

(2) New facilities. New facilities located within seven miles radius upstream of a water supply intake or water supply reservoir, which handle hazardous materials of the types and amounts determined by the department of natural resources, shall perform their operations on impermeable surfaces having spill and leak collection systems are prescribed by the department of natural resources.

(3) Management agreements. The water supply reservoirs in large water supply watersheds are to be managed according to any agreements required by state law.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-28-2013(1), Exh. A, § 7.0)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:heard-county/zoning/46-457@2024-07-16-3449849815

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Heard County Zoning Ordinance, Sec. 46-457. Minimum criteria for large water supply watersheds | Georgia Commons