Hogansville · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article XII - PROCEDURES
Sec. 102-B-12-9. Variances.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(1) Authority. The city council may, in accordance with the procedures set forth in this section, take final action on applications for variances.
(2) Purpose. The purpose of a variance is to provide a mechanism when, owing to special conditions, the strict application of the zoning ordinance would impose on a landowner exceptional and undue hardship.
(3) Initiation. A written petition for a variance may be initiated by the owner(s) of the subject property or the authorized agent(s) of the owner(s) of the property for which relief is sought. Applications shall be filed on forms provided by the zoning administrator and shall not be considered filed unless complete in every respect.
(4) Application procedures. The application shall contain the following information and documentation:
(a) Name, address, telephone number, and email address of owner(s) and applicant, if not owner.
(b) Legal description, street address, lot number and subdivision name, if any, of the property that is the subject of the application.
(c) The size of the subject property.
(d) The purpose for the requested variance, and a statement of the intended development of the property if the variance is granted.
(e) The specific provision of the zoning ordinance from which a variance is requested.
(f) A statement concerning each of the standards for granting variances in subsection
(8) of this section.
(g) A statement explaining how the proposed variance is consistent with the general spirit and intent of the zoning ordinance and the comprehensive plan.
(5) Staff report.
(a) The zoning administrator shall conduct a site inspection and shall prepare an analysis of each application for variance applying the criteria and standards set forth in subsection (8) of this section. The staff report shall be presented in written form to the planning commission at the scheduled hearing date.
(b) The zoning administrator shall prepare a report including all analysis and recommendations for presentation to the planning commission, which report shall be a matter of public record.
(c) The zoning administrator's report may recommend amendments to the applicant's request which would reduce the land area for which the application is made, or recommend conditions of the variance which may be deemed advisable so that the purpose of this article will be served and health, public safety, and general welfare secured.
(6) Public notice procedures. The public notice procedures for a variance application shall be in conformance with subsection 102-B-12-4(5).
(7) Public hearing procedures. The public hearing procedures for a variance application shall be in conformance with subsection 102-B-12-4(6)(a) of this article. The city council may administer oaths and compel attendance of witnesses by subpoena.
(8) Standards for granting variances.
(a) Granting variances. City council shall not grant a variance unless it has, in each case, made specific findings of fact based directly upon the particular evidence presented supporting written conclusions that the variance meets each of the following criteria:
(i) Arises from a condition that is unique and peculiar to the land, structures and buildings involved.
(ii) Is necessary because the particular physical surroundings, the size, shape or topographical condition of the specific property involved would result in unnecessary hardship for the applicant; as distinguished from a mere inconvenience, if the provisions of the zoning ordinance are literally enforced.
(iii) The condition requiring the requested relief is not ordinarily found in properties with the same zoning district designation as the subject property.
(iv) The condition is created by the regulations of the zoning ordinance and not by an action or actions of the property owner or the applicant.
(v) The granting of the variance will not impair or injure other property or improvements in the neighborhood in which the subject property is located, nor impair an adequate supply of light or air to adjacent property, substantially increase the congestion in the public streets, increase the danger of fire, create a hazard to air navigation, endanger the public safety or substantially diminish or impair property values within the neighborhood.
(vi) The variance granted is the minimum variance that will make possible the reasonable use of the land, building or structures.
(vii) The variance desired will not be opposed to the general spirit and intent of the zoning ordinance or the purpose and intent of the comprehensive plan.
(b) No variance shall be authorized to:
(i) Allow a structure or use not authorized in the applicable zoning district or a density of development that is not authorized within such district.
(ii) Conflict with or change any requirement enacted as a condition of zoning or of a special use permit authorized by the city council.
(iii) Reduce, waive or modify in any manner the minimum lot area established by the zoning ordinance in any zoning district.
(iv) Reduce, waive or modify in any manner the minimum lot area established by the city council through a special condition of approval.
(v) Permit the expansion or enlargement of any nonconforming situation or nonconforming use requiring a special use permit.
(vi) Permit the re-establishment of any non-conforming situation or nonconforming use requiring a special use permit where such use has lapsed.
(9) Action by the planning commission.
(a) The secretary shall provide the members of the planning commission complete information on each proposed application for a variance, which the planning commission considers including a copy of the application and supporting materials, and the written report of the zoning administrator applying the required criteria in subsection (8) of this section to each application.
(b) Prior to initiating a motion regarding its recommendation to the city council, the planning commission shall review and consider each of the criteria contained in subsection (8) of this section.
(c) The planning commission recommendation on each application shall be based on a determination as to whether or not the applicant has met the criteria contained in subsection (8) of this section.
(d) The planning commission may recommend the imposition of conditions based upon the facts in a particular case in accordance with subsection 102-B-12-14.
(e) The planning commission may recommend approval of variance application, approval of the application with conditions, or denial of the application. Failure to achieve a majority vote shall result in no recommendation to the city council on the matter.
(f) Time limit. The planning commission shall have 60 days from the date of receipt of a variance application from the zoning administrator within which to file its report and recommendation with the city council. If the planning commission shall fail to file such report and recommendation within the 60-day period, it shall be deemed to have given a recommendation of "approval" on the proposed amendment.
(10) Action by the city council.
(a) The secretary shall provide the city council information from decisions of the planning commission on each proposed application for special variance, including a copy of the application and supporting materials, and the written report of the zoning administrator containing the required criteria in subsection (8) of this section to each application.
(b) After a public notice as required in subsection (6) of this section, the city council shall conduct a public hearing in a manner consistent with subsection (7) of this section.
The city council shall review and consider each of the criteria contained in subsection
(8) of this section.
(c) The decision of the city council on each application for variance shall be based on a discretionary determination as to whether or not the applicant has met the criteria contained in subsection (8) of this section, the consistency of the application with the comprehensive plan, the requirements of the zoning district in which such use is proposed to be located, and whether additional conditions could be imposed which would help ensure the compatibility of the variance with the surrounding properties.
The city council may impose conditions based upon the facts in a particular case in accordance with section 102-B-12-14.
(d) The city council, after conducting the public hearing with public notice required by this section, shall take one of the following actions:
(i) Vote to approve the application.
(ii) Vote to approve the application with conditions.
(iii) Vote to deny the application.
(iv) Vote to defer the application to its next regular meeting or special called meeting.
(v) Vote to refer the matter back to the planning commission for reconsideration at their next regularly scheduled meeting or special called meeting. If such referral includes a public hearing, the matter shall be re-advertised in accordance with subsections 102-B-12-4(5)(a) and (5)(b).
(e) Time limit. The city council shall have 90 days from the date of the regular meeting at which it first receives the report and recommendation of the planning commission for a variance within which to take final action.
(11) Successive applications. An application for a variance affecting all or a portion of the same property that was denied by the city council shall not be accepted sooner than six months after the date of final decision by the city council.
Historia
(Ord. No. 23-0605, § 1(Exh. A), 6-5-2023; Ord. No. 25-0505, § 24, 5-5-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.