Hogansville · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article III - WATERSHED PROTECTION

Sec. 102-C-3-4. Conditions and performance standards.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All uses in the watershed protection district are subject to the following conditions and performance standards:

(1) Buffers. A buffer shall be maintained for a distance of 50 feet on both sides of the perennial stream as measured from the stream banks and for a distance of 100 feet from the reservoir boundary of Blue Creek Reservoir.

(2) Impervious surface. No impervious surface shall be constructed with a 75-foot setback area on both sides of the stream as measured from the stream banks or within a 150-foot setback area from the reservoir boundary.

(3) Septic tanks. Septic tanks and the drain fields of septic tanks are prohibited within 150 feet of a stream bank or of the reservoir boundary.

(4) Exemptions. Exemptions from buffer and setback requirements shall be as follows:

a. Mining activities permitted by the state department of natural resources under the surface mining act (O.C.G.A. § 12-4-70 et seq.) are exempted from the provisions of this division.

b. Utilities from the stream corridor buffer and setback area provisions of this division in accordance with the following conditions if the utilities to be located in the buffer or setback areas cannot feasibly be located outside these areas:

1. The utilities shall be located as far from the stream bank as reasonably possible.

2. The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas as best as reasonably possible.

3. The utilities shall not impair the quality of the drinking water stream.

c. Forestry and agricultural activities from the stream corridor buffer and setback area provisions of this division in accordance with the following conditions:

1. The activity shall be consistent with best management practices established by the forestry commission of the state department of agriculture.

2. The activity shall not impair the quality of the drinking water system.

d. A drainage structure or a roadway drainage structure may be constructed within the Watershed Protection District provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented, along any ephemeral stream. As used in this provision, the term "ephemeral stream" means a stream that: under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round;

for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to O.C.G.A. sec. 12, ch. 5, art. 5, pt. 6, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the building official as provided in this paragraph. The following requirements shall apply to any such buffer:

1. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his/her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and

2. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

i. Stream crossings for water lines, or ii. Stream crossings for sewer lines.

(5) Site plans required. Except for the exemptions listed in subsection (7) of this section, all forms of development within the watershed protection district shall be required to have a site plan prepared and approved according to this division before any building permits or other development related permits may be issued or any land disturbing activity may take place. Each site plan submitted under this division shall include the following:

a. A site plan drawn to a scale and showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, watercourses, and drainageways; water, wastewater, and stormwater facilities;

and utility installations.

b. Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site.

c. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

d. Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet.

e. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

f. Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale and vertical scale must be shown on cross sectional drawings.

(6) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of such site plan.

Significant changes to the site plan, that would alter the amount and velocity of stormwater runoff from the site, increase the amount or provisions of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of the building official. Minor changes such as realignment of streets, or minor alterations to drainage structures and other infrastructure, to meet unexpected conditions are exempted from this requirement.

(7) Exemptions from site plan requirement. The following activities and developments are exempt from the requirement for detailed site plans:

a. Single-family detached homes constructed within a subdivision of fewer than five parcels.

b. Repairs to a facility that is part of a previously approved and permitted development.

c. Construction of minor structures such as sheds, or additions to single-family residences.

d. Agriculture and forestry. Normal agricultural activities including planting and harvesting of crops are exempted if they conform to best management practices established by the state department of agriculture. Agricultural activities must conform to best management practices established by the state forestry commission.

e. Mining activities. All mining activities that are permitted by the state department of natural resources under the Georgia Surface Mining Act.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 23-0605, § 1(Exh. A), 6-5-2023; Ord. No. 24-0916, § 1, 9-16-2024)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hogansville/zoning/102-c-3-4@2026-11-11-4b01476f44

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hogansville Zoning Ordinance, Sec. 102-C-3-4. Conditions and performance standards | Georgia Commons