Jesup · Ordenanza de zonificación
Appendix A - ZONING REVISED ZONING ORDINANCE / Article X - ADMINISTRATION, ENFORCEMENT AND PENALTIES
Section 105. Certificate of occupancy required.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A certificate of occupancy issued by the building inspector is required in advance of occupancy or use of:
105.1 A building hereafter erected, altered or moved;
105.2 Any lot or a change in the use hereof,
105.3 Any nonconforming use that is existing at the time of the enactment of this ordinance or an amendment thereto or that is changed, extended, altered or rebuilt thereafter. The certificate of occupancy shall state specifically wherein the nonconforming use fails to meet the provisions of this ordinance.
A certificate of occupancy, either for the whole or a part of a building, shall be applied for coincident with the application for a building permit and shall be issued within ten days after the erection or structural alterations of such building, or part, shall have been completed in conformity with the provisions of this ordinance. A certificate of occupancy shall not be issued unless the proposed use of a building or land conforms to the applicable provisions of this ordinance. If the certificate of occupancy is denied, the building inspector shall be notified of the refusal. A record of all certificates shall be kept on file in the office of the building inspector, and copies shall be furnished on request to any person having a proprietary or tenancy interest in the building or land involved.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.