79.5. Application procedure:

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) The owner(s) shall submit to the planning commission a plan for the development and use of a tract meeting the requirements set forth in this section. At that time the owner(s) shall request an amendment to the Jesup Zoning Map and designation of the tract as planned unit development district.

(b) The plan shall include the following:

(1) A site plan indicating:

North arrow and scale;

Topography, not more than five-foot intervals;

Uses of buildings and areas;

Building locations and sizes;

Off-street parking areas, drives, walks;

Points of access and egress;

Utility services supplied;

Owner's name and address; and Developer's name and address.

(2) A copy of any deed restrictions to be recorded.

(3) A drainage plan approved by the city engineer.

(c) Additional requirements may be recommended by the planning commission for the protection of adjoining property or for the benefit and enhancement of the development. The planning commission shall report its recommendation for approval or disapproval with reasons and any additional requirements to the board of commissioners for action. If no report is submitted by the planning commission within 30 days of referral, the board of commissioners may take action without such a report.

(d) Amendments to the zoning map will follow procedures set forth in article XI of this ordinance.

79.6 Planned unit development districts will be designated PUD and numbered sequentially beginning with PUD-1.

79.7 Delay in construction. In the event that construction is not begun within two years from the date of approval by the board of commissioners, or is begun but is halted for a period of more than one year, said approval shall be void. Reapproval must follow the procedure set forth in paragraph 79.5 of this section.

79.8 Amendment to the plan. The plan may be amended in accordance with the procedures set forth in paragraph 79.5 of this section.

/first/pubdocs/mcc/3/11053_full_tag_mcc_3_mford Table 1 DIMENSIONAL REQUIREMENTS BY DISTRICT District Total Area (sq. ft.) Minimum Lot Size Area Per Dwelling Unit (sq. ft.) Lot Width in Feet Minimum Front Yard Setback (ft.) Minimum Side Yard Width (ft.) Minimum Rear Yard Depth (ft.) Maximum Height (ft.) Maximum Lot Coverage Percentage A-1 1 acre 1 acre 100 50 10 each* 30 35 40 R-1 18,000 18,000 100 50 10 each* 30 35 40 R-2 12,000 First Dwelling Unit—12,000 Each Additional Unit—4,000

First Dwelling Unit-80 Each Additional Unit—5 40 10 each* 30 35 40 R-3 7,200 First Dwelling Unit—7,200 Each additional Unit—2,000 First Dwelling Unit-60 Each Additional Unit—5 25 8 each* 25 35 50 P-R 7,200 First Dwelling Unit—7,200 Each Additional Unit—3,000 First Dwelling Unit-60 Each Additional Unit—5 25 8 each* 25 50 50 C-1 Note 1 Note 1 C-2 30 Note 1 Note 1 40 C-3 40 Note 1 Note 1 40 L-I 50 25 each or Note 2 25 each or Note 2 40 R-L-I Note 3 Note 3 Note 3 PUD (Minimum required area—Ten acres.) 60 *Add ten feet along street side corner lot.

Note 1—Minimum required side and rear yard—None, but if provided—Four feet.

Minimum required abutting residential or professional residential district—ten feet.

Note 2—Minimum required building setback abutting residential or professional residential district—200 feet.

Minimum required setback for parking area which abuts residential or professional residential district—100 feet.

Note 3—All dimensional requirements set forth in the National Fire Protection Code, and any other requirements the planning commission may deem necessary upon proper review shall be complied with.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jesup/zoning/79.5@2026-11-11-5f4dd70d40

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Jesup Zoning Ordinance, 79.5. Application procedure: | Georgia Commons