Sec. 113-63. Building permits.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) Applicable codes. Building permits for all structures or interior finishes are issued after meeting the applicable requirements of the fire prevention and life safety codes, health, water and sewer regulations, and provisions of building codes of the city or utility providers, the provisions of any certificate approved under the Metropolitan River Protection Act, if applicable, and the provisions of these regulations.

(2) Sanitary sewage disposal.

a. Septic systems. For any structure for which on-site sewage disposal (septic

systems) will be provided, a permit issued by the county health and wellness department shall be required prior to

issuance of a building permit. Said permit may first require approval by the county health and wellness department

of a plan showing the location of the sewage disposal system and other site improvements, in accordance with their regulations.

b. Connection to public sanitary sewer. Any structure which requires a connection to or modification of the existing sanitary sewer system shall require approval from the county prior to the issuance of a

building permit.

(3) Potable water supply. For any structure for which a connection to the potable water system is required, proof of approval from the water provider shall first be provided.

(4) Single-family and duplex residences.

a. A building permit for a single or two-family residence may be issued after the recording of a final plat or after the lot upon which the building is to be

located has otherwise become a buildable lot of record or as a model home permit as provided for in subsection (9) of this section.

b. The approval by the department of a residential site plan may be required prior to issuance of the building permit, as

noted and conditioned on the final plat or as may be required for compliance with

the Chattahoochee River Corridor. For such lots, a certificate of occupancy shall not be issued until conformance to the

site plan has been field verified by the department. A certified as-built survey

prepared by registered land surveyor may be required where, in the opinion of the director, the foundation may

encroach in any setback or buffer or river corridor requirements may not have been met.

c. For single or two-family residences where land disturbing activities exceed 5,000 square feet a land disturbance permit may be required in accordance with the provisions of subsection 113-62(2) of these regulations prior to the issuance of a building permit.

(5) Swimming pools. Issuance of a building permit for a swimming pool as an accessory use to a single or two-family residence, whether to be issued at the same time as or subsequent to the permitting or construction of the house or duplex, shall first require approval of a swimming pool site plan. The plan shall show the proposed location of the swimming pool and enclosing fence relative to the residence, the property boundaries, setback lines, septic tank and septic tank drain field (if any), and any easements on the site, and shall comply with all requirements of the zoning ordinance, swimming pool code, and Metropolitan River Protection Act. A certificate of occupancy or a certificate of completion shall not be issued until conformance to the swimming pool site plan and all applicable building codes has been field verified by the department.

(6) Multi-family and nonresidential structures.

a. Issuance of a building permit for any principal building other than a

single-family detached or duplex residence (and associated accessory structure) shall first require issuance of a land disturbance permit for the building site if the disturbance is equal to or

greater than 5,000 square feet, and the building permit shall be consistent with said land disturbance permit.

b. Building plans must be reviewed and approved by the department prior to permitting for all structures.

c. Fulton County approval may be required prior to the issuance of a building permit for construction activities involving, food service, commercial swimming pools,

dumpster pads, hotels or motels, grease traps, etc.

(7) Demolition permits. Demolition permits shall be required for the partial or complete demolition of the interior or exterior of any structure within the city. Pursuant to the State of Georgia's Asbestos Safety Act an asbestos survey shall be required as well as a rodent infestation letter from a licensed pest control agency.

(8) Expiration of building permits. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the worked is commenced. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause must be demonstrated.

Extensions shall be in writing by the building official.

(9) Issuance of building permits prior to final plat. Building permits shall only be issued on buildable lots of record, as defined in these regulations, except under special circumstances limited to and as specifically described in this section.

a. Single-family residential model homes.

In single-family detached and duplex residential subdivisions, after approval of the land disturbance permit the

sub-divider may be allowed one building permit for each 15 lots located in the proposed subdivision provided the sub-divider provides an agreement to install improvements form provided by the city and a surety agreement equal to 125 percent of the cost of the remaining infrastructure improvements, based on

written estimates by the design professional for the project. No more than seven building permits for model homes will be allowed in any one subdivision. For lots where model homes are proposed the following conditions must be met prior to the issuance of the building permits:

1. The lots shall be located within 300 feet of an active fire hydrant;

2. Sanitary sewer and water service for these lots shall be installed and approved by the governing regulatory authority; and

3. The lots shall have a paved street to the structure.

A certificate of occupancy shall not be issued for the completed model home until the final plat encompassing the model home building lots has been approved and recorded, without the express approval of the director.

b. Nonresidential subdivisions and other developments. Building permits may be

issued by the department after a land disturbance permit has been approved reflecting the site plan and construction drawings for specific buildings and

associated site improvements. Issuance of the building permits shall be conditioned on the following:

1. An approved surety agreement shall have been received in a form acceptable to the city attorney, drawn in favor of the city and in an amount not less than 125 percent of the cost of completing all public improvements as authorized and required by the land disturbance permit;

2. Fire marshal approval shall be required prior to issuance of any building permit, which may include approval of acceptable access and water under pressure for combustible construction;

3. Approval of the county health and wellness department for onsite sewage disposal or the county sewer department for a building to be served by public sewer shall be required prior to issuance of any building permit;

4. Construction of the required public improvements shall proceed concurrently with construction of the buildings; and

5. No certificate of occupancy shall be approved for any structure within the development prior to recording of the final plat or certificate of completion without the express approval of the director.

c. Fee-simple townhouse subdivisions. A building permit may be issued on a buildable lot of record established for each building (containing any number of townhouse dwelling units) through recording of a final plat following completion of all required public improvements. Upon completion of the buildings, the final plat shall be rerecorded to establish individual lots for the townhouse units, based on their

actual locations, prior to issuance of certificates of occupancy.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2009-06-18, (6.3), 6-29-2009)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:johns-creek/zoning/113-63@2026-11-11-c332057b0c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.