Ir al contenido
Georgia Commons
Menú

Jonesboro · Ordenanza de zonificación

Chapter 86 - ZONING / Article XVII - ADDITIONAL CONDITIONAL USES

Sec. 86-658. NAICS 221118—Electronic vehicle charging stations (privately funded).

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following conditions are assigned in the CCM, RM, H-1, H-2, O&I, MX, C-1, C-2 and M-1 districts:

(1) EV stations are considered accessory to the primary use on the property.

(2) Site plan for stations shall be reviewed and approved by the mayor and city council.

(3) Charging station outlets and connector devices shall be no higher than 48 inches from the surface where mounted. Equipment mounted on pedestals, lighting posts, bollards, or other devices shall be designed and located as to not impede pedestrian travel or create trip hazards on sidewalks.

(4) Adequate battery charging station protection, such as concrete-filled steel bollards, shall be used. Curbing may be used in lieu of bollards, if the battery charging station is setback a minimum of 24 inches from the face of the curb.

(5) Electric vehicle charging stations shall be maintained in all respects, including the functioning of the equipment. A phone number or other contact information shall be provided on the equipment for reporting when it is not functioning or other problems are encountered.

(6) Unless otherwise directed by the city, within 90 days of cessation of use of the electric vehicle charging station, the property owner or operator shall restore the site to its original condition. Should the property owner or operator fail to complete said removal within 90 days, the (local government) shall conduct the removal and disposal of improvements at the property owner or operator's sole cost and expense.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2022-010, § 1(Exh. A), 3-14-2022; Ord. No. 2024-007, § 1(Exh. A), 6-10-2024)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jonesboro/zoning/86-658@2026-11-14-23b1230581

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Jonesboro Zoning Ordinance, Sec. 86-658. NAICS 221118—Electronic vehicle charging stations (privately funded) | Georgia Commons