Ir al contenido
Georgia Commons
Menú

Kennesaw · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE

6.03.02. Conformance by developers; acceptance of public right-of-way

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) The owner, developer, or any other person or entity developing a subdivision, a shopping center, industrial park, office park, apartment complex or like development constructing new streets or roads to be dedicated to the City or utilize existing City roads or any combination thereof shall be required to provide street lights which conform to all standards provided in this article.

(b) The City will not accept any streets for dedication unless the provisions of this article are complied with. The Public Works Director shall not recommend the acceptance of any public streets or roads proposed to be dedicated to the City for perpetual ownership and maintenance until such time as the street lights conform to the approval street light layout.

Unless waived by the Public Works Director, the developer, at the time of submitting the final plat to the City, shall:

(1) Submit a final street light layout prepared by the utility company which will provide the lighting service showing the exact location of street lights within the development. For residential subdivisions, this drawing must be approved by the public works department prior to obtaining any building permit within the subdivision. For nonresidential developments, the drawing must be approved by the public works department and payment made for installation of standards/poles prior to acceptance by the city of any streets or roads for public maintenance. Fixtures and standards/ poles installed or used shall be approved by the utility company, which will be responsible for the maintenance of the facilities.

(2) Pay all costs for standards/poles, fixtures and any other related items or materials necessary for the installation.

(3) Submit proof of payment for complete installation to the public works department.

(4) Submit a copy of an executed agreement with the utility company for complete maintenance of all installations.

(5) Submit an executed contract between the homeowners' association and an independent electrical contractor for complete maintenance and/or replacement of such lighting, equipment and wiring.

(6) The following requirements are minimum requirements pertaining to street lighting.

The Public Works Department or the City may require additional information or conditions prior to final approval:

i) Lighting plan drawn to scale showing the location of all proposed lights, including all nearby City and County streets;

ii) Arrangement of all poles;

iii) Height of all poles;

iv) Type of electrical service (underground or overhead);

v) Number of luminaries per pole;

vi) Mounting heights of luminaries;

vii) Wattage of proposed lights;

viii) Mounting angle of fixtures;

ix) Lamp source to be used;

x) Photograph of the light to be utilized must be attached to the final plans.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2018-07, 4-2-18)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:kennesaw/zoning/6.03.02@2026-11-11-79dd7b3878

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Kennesaw Zoning Ordinance, 6.03.02. Conformance by developers; acceptance of public right-of-way | Georgia Commons