LaGrange · Ordenanza de zonificación
Title 25C - DEVELOPMENT AND PERMITTING / Chapter 25C-30 - STORMWATER MANAGEMENT
Sec. 25C-30-4. Inspection and enforcement.
Sobre este texto
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Inspection.
(1) The department of community development shall determine whether the development is proceeding in accordance with the approved stormwater management plan. Periodic inspection of the development site shall be made to ensure that the stormwater management plan is properly implemented.
(2) The department of community development shall be permitted to enter upon all properties for the purpose of inspection, observation, and management in accordance with the provisions of this chapter.
(b) Final inspection and as-built certification of stormwater management facilities. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual "as built" plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer licensed in the State of Georgia that the as-built conditions regarding storage and outflow meet the requirements of this chapter. A final inspection by the city is required before the release of any performance securities can occur.
(c) Enforcement. If work performed does not conform to the provisions of the approved stormwater management plan, a stop work order applicable to all construction activity, except that necessary for correction of the violation, shall be served upon the owner. Upon correction of the violation the stop work order shall be voided and construction may resume.
Historia
(Ord. No. 21-10, § 1, 6-22-21)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.