Ir al contenido
Georgia Commons
Menú

Lamar County · Ordenanza de zonificación

Appendix 1 - ZONING / Article 21 - WATERSHED DISTRICTS

Sec. 2105. Permit review.

Sobre este texto

  • As published by Municode, current through 2024-12-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Applications for a development permit within the above stated "water supply watershed districts" shall include the following:

(a) Existing conditions. Each application shall comply with all existing ordinances, amendments thereto and subsequent amendments. Said ordinances include, but are not limited to, the Lamar County Zoning

Ordinance, Lamar County Development Ordinance, Lamar County Soil Erosion and Sedimentation Control Ordinance and Lamar County Flood Prevention Ordinance.

(b) Additional requirements for development of property located in the water supply watershed districts. In addition to the requirements of each of the above referenced ordinances, site plans or construction improvement plans for development of property shall contain the following

additional information:

(1) The total square feet and acres of property to be developed.

(2) Location, dimensions, and area (in square feet) of all impervious surfaces, both existing and proposed, on the site.

(3) The distance of each impervious structure and surface to the nearest bank of an affected perennial stream and

reservoir.

(4) The location of each perennial stream that crosses or abuts the site.

(5) The location of each public reservoir that abuts the site.

(6) The location, elevation, and orientation of the one (1) percent annual chance floodplain on the site.

(7) The site plan submitted shall contain a certification issued by a registered land surveyor or registered engineer verifying the location of the site as being located either within

the water quality critical area, the limited development area, or outside of both areas.

(8) Location and detailed design of any spill and leak collection systems designed for the purposes of containing accidentally released hazardous or

toxic materials.

(c) Additional requirements for building permits. In addition to the requirements of each of the above referenced ordinances,

the following information shall accompany each building permit requested:

(1) The total square feet and acres of property to be developed.

(2) Location, dimensions, and area (in square feet) of all impervious surfaces, both existing and proposed, on the site.

(3) The site plan shall contain a certification issued by a registered land surveyor, landscape architect or registered engineer verifying the impervious surface calculations of the proposed development.

(4) The distance of each impervious structure and surface to the nearest bank of an affected perennial stream and

reservoir.

(5) The location of each perennial stream that crosses or abuts the site.

(6) The location of each public reservoir that abuts the site.

(7) The location and orientation of the one (1) percent annual chance floodplain on the site.

(8) The site plan submitted shall contain a certification issued by a registered land surveyor or registered engineer verifying the location of the site as being located either within

the water quality critical area, the limited development area, or outside of both areas.

(9) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or

toxic materials.

(d) Activities to comply with site development plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of those plans. Significant changes to the site plan, which would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervi- ous surface within the development, alter the overall density of development, result in considerable increase in the amount of excavation, fill or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of the Lamar County Building and Zoning Department. Any such amendments shall also comply with all other applicable ordinances and laws.

(e) Exemptions from site development plan requirements.

(1) Repairs to a facility that is a part of a previously approved and permitted development.

(2) Accessory structures such as barns, sheds, or additions to single-family dwellings.

(f) Duration of permit validity.

(1) If construction described in the development permit has not commenced within twelve (12) months from the

date of issuance, the permit shall expire.

(2) If construction described in the development permit is suspended after work has commenced, the permit

shall expire twelve (12) months after the date the work ceased, or at twelve

(12) months from the issue date if work has been suspended for over six (6) months, whichever is first. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as far as practicable.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2010-16, 11-16-10)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lamar-county/zoning/2105@2024-12-17-463386bb46

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Lamar County Zoning Ordinance, Sec. 2105. Permit review | Georgia Commons