The construction plans must conform to all specifications required for the preliminary plat, and include the following:
A. Layout and names of proposed public roads, alleys, and public walkways (bike trails, sidewalks, paths, etc.), with width of pavement and right-of-way, including
the capability of the tract to be subdivided to connect to existing and future development of adjacent tracts.
B. Layout of all lots, including building setback lines, lot dimensions, and area/ square footage of lots, showing all existing and proposed easements (drainage, water, sewer, storm pipes, etc.), and their location on all lots. It shall also include the proximity (distance and location) of all adjacent easements and utilities.
C. Lots with detention ponds, or any waters of the state, on them must meet the
minimum zoning area requirements exclusive of the area of the pond. Lots with detention ponds must meet the setback requirements of the applicable zoning district to be declared a buildable lot. Homes or buildings may not be set
closer than twenty-five (25) feet to a detention/retention pond, regardless of the home's/building's compliance with the setback requirements.
D. Flood elevations on any lots within a one
(1) percent annual chance flood area, in addition, the foundation elevation that is a minimum of two (2) feet above the
established one (1) percent annual chance flood elevation shall be shown. This data may be shown either on the lot layout or in tabular form. The flood hazard area
shall include both studied and unstudied streams, including drainage ways as
designated on the preliminary plat.
E. Construction plans of roads, including typical cross section and grade profiles, shall show the percent of each grade and length of each vertical curve. The
minimum sight distance for intersecting roads is two hundred fifty (250) feet.
F. Construction plans of sanitary sewers with grades, service, pipe, size, and points of discharge and connection to other trunk or lateral sewers.
G. Show the centerline stopping distance for all points of access onto state and
county public roads, showing posted speed limits of such public roads.
H. Construction plans of storm drainage systems with grade, pipe sizes, lengths, location of outlets, runoff and velocity calculations, and other drainage
structures. All storm drainage systems carrying off-site runoff shall be designed for the one (1) percent annual chance
flood event. All storm pipes within the public road right-of-way shall be asphalt coated corrugated metal pipe or concrete.
I. Improvement construction plans of water supply systems with pipe sizes and location of hydrants, valves, and all other appurtenances.
J. Draft of proposed deed restrictions/ covenants to be imposed on any/or all parcels within the development.
K. Easements for drainage and proposed and existing water and sewer lines and utilities along the side and rear lot lines or wherever else they may be placed, and watercourses as required in section 504(A).
L. Proposed soil erosion and sedimentation control plan.
M. Projected final contours: In some cases, the street profiles will suffice in showing the amount of cut and fill; however, in all cases, final contours need to be shown on the plans.
N. Show a five (5) foot high fence surrounding all detention ponds with a one hundred
(100) year pond elevation over four (4) feet, and a ten-foot wide gate to be located as to provide the best vehicular access. Vegetation shall be planted around all fences in order to minimize the visual impact the fencing has on a development, except at the designated gate area.
O. Detail drawings: Any structural practice used should be explained and illustrated with detail drawings and must meet
minimum county standards.
P. Show the following notes on all plans:
1. That all storm sewer, sanitary sewer, water, etc. easements exist where
such utilities are placed. If placed on or along property lines, such utilities or infrastructure shall be centered on lot lines. All easements shall include an indication of their width.
2. All storm drains shall be extended a minimum of thirty (30) feet behind any home(s) or building(s).
3. Grade stakes shall be set on all streets prior to any street grading.
An as-built subgrade centerline profile shall be submitted and approved by the county prior to the installation of curb and gutter or other infrastructure and utility improvements.
4. All undisturbed buffers shall be field located, staked and flagged, or
marked with tenzar, and shall be submitted to the county for approval prior to grading.
5. Total amount of impervious surface of the entire site. Must meet the standards as regulated in the Lamar County Zoning Ordinance.
Q. A bond or letter of credit must be secured by the developer of one and one-half (1�) times the estimated cost of the improvements, in favor of the Lamar County Board of Commissioners, prior to
undertaking any site improvements.
R. Certifications:
1. The following certifications inscribed directly on the construction plans:
a. Construction plans must bear the seal of a registered professional engineer.
b. Certificates or statements of approval of the sewage disposal system in the proposed subdivision obtained from the appropriate water and sewer
authority, the Lamar County Health Department, and the Environmental Protection Division of the Georgia Department of Natural Resources, as applicable.
c. Certificates or statements of approval of the water system in the proposed subdivision obtained from the water authority, the Lamar County Health Department, and the
Environmental Protection Division of the Georgia Department of Natural Resources, as applicable.
Historia
(Ord. No. 2022-06, § 1, 8-16-22)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.