Lavonia · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 102 - ZONING / Article IX - MANUFACTURED HOUSING
Sec. 102-273. Manufactured home installation requirements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Utility connections all manufactured homes must be permanently connected to water, sewerage, and electrical service.
(1) Water. Water must be either from the Lavonia Water System or a well located on site if city water service is not available. Connections procedures must meet the most current International Plumbing Code requirements and must be freeze proof and belowground. The city building inspector must inspect all water connections.
(2) Sewer. All plumbing of the septic tank system must meet the International Plumbing Code and/or all Franklin County Health Department requirements and inspections.
All plumbing for a city sewer connection must be approved by the city water and sewer superintendent and inspected by the city building inspector.
(3) Electrical. Electrical service must meet the requirements of the most recent International Electrical Code. All electrical connections must be inspected and approved by the city building inspector before issuance of the certificate of occupancy to the servicing power company for installation of permanent power service to the manufactured home.
(b) Hauling mechanisms. The transportation mechanisms including the wheels, axles, hitch, and any other device or devices used in the transportation of the manufactured home to the site must be removed prior to final setup and skirting.
(c) Footings/foundations/pier systems/skirting/tie-downs/steps and landings. All manufactured homes must be installed on a pier system, installed with permanent skirting, secured with tie down devices, and provided with steps and landings.
(1) Footings. All piers shall be placed on a footing of solid concrete not less than 24 inches by 24 inches by six inches deep on compacted or undisturbed soil. (24" × 24" × 6").
(2) Foundations. All permanent foundations must be installed according to the manufactured home installation specifications and the International Building Code.
(3) Pier systems. Piers or load-bearing supports or devices shall be designed and constructed as per the manufactured home installation instructions to evenly distribute the loads. Piers shall be securely attached to the frame of the manufactured home or shall extend at least six inches from the centerline of the frame member. Manufactured load-bearing supports or devices shall be listed or approved for the use intended, or piers shall be constructed as follows:
a. Piers less than 40 inches in height shall be constructed of open or closed cell, eight-inch by eight-inch by 16-inch concrete blocks with the open cells vertically placed upon the footer. Single-stacked block piers shall be installed with the 16-inch dimensions perpendicular to the main frame. The piers shall be covered with a two-inch by eight-inch by 16-inch pressure treated wood or concrete cap.
b. Piers between 40 and 72 inches in height and all corner piers over three blocks high shall be double-blocked with blocks interlocked and capped with four-inch by 16-inch by 16-inch solid concrete block or equivalent.
c. Piers up to a maximum allowable height of 80 inches shall be constructed in accordance with the previous requirements and shall also be laid in concrete mortar and steel-reinforcing bars inserted into the block cells and then filled with concrete.
(4) Skirting. The entire perimeter between the bottom of the structure and the ground of each manufactured home shall be skirted or underpinned with brick, masonry, or finished concrete. All skirting shall be installed according to the manufacturers' installation and instructions so that the entirety of the perimeter of the undercarriage of the manufactured home is enclosed except for proper ventilation and/or access openings.
(5) Tie-downs. Each manufactured home shall have tie-downs or other devices securing the stability of the manufactured home as per the Installation of Manufactured Homes and Mobile Homes Rules and Regulations established and published by Georgia Safety Fire Commissioner (O.C.G.A. 8-2-160 et seq.).
a. The requirements for units 14 feet and less in width include two types of anchorage; over the top tie-downs to restrict overturning and frame tie-downs to restrict the unit from being pushed from its piers.
b. The requirements for units over 14 feet in width (commonly called "doublewides") require frame tie-downs only.
(6) Steps and landings. Steps and landings are required at each exterior doorway and shall be constructed to the standards of the International Building Code for stairway and landing construction. Landings constructed at front entry doorways must be a minimum of 48 inches by 72 inches (48" × 72"); and rear entry doorways, a minimum of 36 inches by 48 inches (36" × 48"). All landings shall extend a minimum of six inches beyond the edges of each exterior doorway.
Historia
(Ord. of 9-3-2002; Ord. of 11-3-2003(2); Ord. of 10-4-2010, § VI)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.