Ir al contenido
Georgia Commons
Menú

Lee County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 1 - GENERALLY

Sec. 38-208. Cleanup, site restoration and site maintenance.

Sobre este texto

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Project sites shall be kept clean at all times. Loose dirt shall not be allowed to clog ditches or cover sidewalks. Soft clay or other undesirable material removed from the trenches shall be removed from the streets, sidewalks, ditches, curb and gutter and [any] other drainage structures.

(b) All pavement, sidewalks, driveways, curb, gutter, drains or similar items removed or damaged during or by construction shall be replaced with construction of first class materials and workmanship. All pavement shall be replaced in accordance with the provisions of this chapter.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-18-00(2), § 38-207)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lee-county/zoning/38-208@2026-06-23-732fddf87f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Lee County Zoning Ordinance, Sec. 38-208. Cleanup, site restoration and site maintenance | Georgia Commons