Ir al contenido
Georgia Commons
Menú

Lee County · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 2 - GENERAL CONSTRUCTION STANDARDS AND SPECIFICATIONS

Sec. 38-214. General.

Sobre este texto

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Construction specifications for road subgrade, base and surface coarse. Construction specifications for roads shall be per Standard Specification, Construction of Roads and Bridges of the State of Georgia, latest edition and supplements. All references in the document meaning the state department of transportation or the state department of transportation engineer shall mean Lee County and the Lee County Manager of Development Services.

(b) Sampling and testing.

(1) Provide quality control testing during construction as necessary to assure the entire earthwork including all fill layers, subgrades, and bases meet specified requirements.

Remove and reconstruct, or otherwise correct work which falls below specified density or is outside other specified limits.

(2) Employ an independent testing laboratory to perform quality control testing during trenching and backfilling operations.

(3) The manager of development services may perform sampling, surveying, inspection or testing activity during construction for the county's use, but such activity does not relieve the contractor from his responsibility to achieve specified results.

(c) Quality control testing reports.

(1) After completing construction and prior to the closing of the approved permit, the contractor may be required to file copies of the quality control test results demonstrating compliance with these specifications with the manager of development services.

Which quality control tests results to be submitted shall be requested by the manager of development services at the time of application review. Such application review request period shall not limit the manager of development services from requiring additional tests during the construction process.

(2) At any time during the construction process, the manager of development services may request to review any quality control test results. The contractor shall provide all quality control test results.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-18-2000(2), § 38-214)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lee-county/zoning/38-214@2026-06-23-31df48b0ae

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Lee County Zoning Ordinance, Sec. 38-214. General | Georgia Commons