Sec. 38-217. Pipe line and accessories construction.
Sobre este texto
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Disposition of defective material. All material found during the progress of the work to have flaws or other defects, shall be rejected and promptly removed from the construction site.
(b) Handling pipe and accessories.
(1) Pipe shall be handled in such a manner that a minimum amount of damage to the coating will result. Damaged coating shall be repaired in accordance with the pipe manufacturer's recommendations.
(2) The interior of all pipe, fittings, an other accessories shall be kept free from dirt and foreign matter at all times. Each pipe shall have a swab run through it until all foreign matter has been removed.
(3) Valves and hydrants shall be drained and stored in a manner that will protect them from damage by freezing.
(4) All pipe, including water, sewer, and stormwater conveyance, shall have #6 tracer wire laid directly on top of the pipe for the entire length of the pipe.
a. For all sewer and stormwater lines the tracer wire shall originate and/or terminate inside of the manhole structures to provide easy access to the end of the wire for location. The locate wire shall be located inside the structure and shall enter under the ring, tabletop or whatever form of cover is installed so that the wire has at least one foot of excess wire inside of the structure and the wire shall be located on the same side of the structure as the pipe it serves to identify.
(c) Alignment and grade.
(1) All pipe shall be laid and maintained to the required lines and grades, with accessories at the required locations and with joints centered and spigots home and with all accessories plumb where applicable.
(2) Temporary support, adequate protection and maintenance of all underground and surface utility structures, drains, sewer and other obstructions encountered in the progress of construction shall be furnished.
(3) When an obstruction is encountered, make necessary changes in alignment or grade as approved by the manager of development services to avoid same.
(4) Whenever necessary to determine the location of existing pipe, valves or other underground structures, examine all available records and make all explorations and excavations for such purpose. This investigation shall be made in advance of any pipe laying.
(d) Excavation and trenching.
(1) Perform all excavation of every description and of whatever substance encountered to the depth specified on the approved plans. The contractor shall be responsible for compliance with all proper trenching safety and construction methods and OSHA regulations. Passing inspections by the manager of development services shall not be construed as to have also being in compliance with proper trenching safety and construction methods and OSHA regulations. All excavated material not required for filling shall be removed from the site and deposited in a manner and location as approved.
(2) No more than 300 feet of trench shall be open at any one time in advance of the completed pipe, nor left unfilled for more than 200 feet in rear thereof, except by written permission of the manager of development services.
(3) Excavation for structures shall be of sufficient size to leave at least one foot in the clear between their outer surface and the embankment or timber which may protect it. The trench width my vary with and depend upon the depth of trench and the nature of the excavated material encounters, but in any case shall be of ample width to permit the pipe to be laid and jointed properly and the backfill to be placed and compacted properly. The minimum width of unsheathed trench shall be 18 inches and for pipe ten inches and larger, at least one foot greater than the nominal diameter of the pipe; the maximum width of trench shall not be more than two feet greater than the pipe diameter. This should provide space as necessary on each side of the pipe for thoroughly tamping the bedding material under and around the pipe.
(4) Over cut in depths of structures and pipe trenches shall be backfilled with approved material and thoroughly compacted.
(5) All excavated material shall be piled in a manner that will not endanger the work and that will avoid obstructing sidewalks and driveways. Gutters shall be kept clear or other satisfactory provisions made for street drainage. Storm drains shall also be kept clear.
(6) The sides of all trenches shall be as nearly vertical as possible, sloped sides may be used only in open country and approved by the manager of development services. If sloped sides are approved, the trench sides shall be vertical from the invert of the trench to a minimum of one foot above the pipe.
(7) The bottom of the trench on which the pipe is to be laid shall be free from projecting stones, roots or any inequalities, and shall be brought to a true grade and so shaped as to conform to the bottom quadrant of the pipe to provide a firm, uniform bearing for the entire laying length of the pipe. Recesses shall be formed in the trench to receive the bells of the pipe or to provide ample space for making joints for tongue and groove pipe.
(8) Undercutting of trench bottom shall be backfilled with select material from the excavations and compacted to not less than 95 percent maximum density as determined by AASHTO T-99, prior to placing pipe. Select material shall be granular soil, free from rock, grass, wood or other similar material. If the material from the excavation is not satisfactory for backfill, the under cut shall be backfilled with gravel or slag.
(9) If rock is encountered in excavating the trenches, it shall be removed to a depth of at least six inches below grade and the trench brought to grade by filling with suitable material, thoroughly tamped to the contour of the bottom of the pipe.
(e) Shoring and sheeting.
(1) Upon written order of the manager of development services, sheeting or bracing may be left in place, to be embedded by the backfilling of the trench. The sheeting so left in place shall be cut off at an elevation at least 12 inches below surrounding grade and shall, in no case, be less than three feet below the finished grade of the street, or, in the absence of any street grade, from the surface of the ground.
(2) All sheeting and bracing not left in place shall be removed in such a manner as to not endanger the constructed pipe line, or other public or private structures or utilities. All voids left or caused by the withdrawal of sheeting shall be immediately refilled and compacted by ramming tools adapted for the purpose, by puddling, or otherwise as directed.
(3) When it is necessary that sheeting be driven to a depth of two feet or more below the invert elevation of the pipe for the protection of the bottom portion of the trench, the sheeting shall be cut off at the level of the top of the pipe, leaving the lower portion in place.
(f) Groundwater pumping.
(1) Pumping shall be conducted as may be necessary to permit the construction to proceed in an expeditious and workmanship manner. Removed water shall be disposed and excavations shall be constructed in such a manner as not to cause any nuisance or any injury to public health or public or private property or to any portion of the work completed or in progress, or to the surface of the streets or any impediment to the use of the streets by the public.
(2) In no case shall water be allowed to run over the foundation, the invert, or through the pipe until the pipe joints have hardened to the satisfaction of the manager of developments services.
(g) Laying pipe.
(1) All foreign matter or dirt shall be removed from the inside of the pipe before it is lowered into its position in the trench and it shall be kept clean by approved means during and after laying. All surplus jointing material and earth which may bind the entrance into the pipe in making the joint shall be removed.
(2) When pipe laying is not in progress, the open ends of the pipe shall be closed and no trench water shall be permitted to enter the pipe.
(3) Pipe shall be laid with bell ends facing in the direction of laying. For lines on an appreciable slope, bells shall face upgrade.
(4) Wherever necessary to deflect pipe from a straight line, either in vertical or horizontal plane, to avoid obstructions, to plumb stems, or where long radius curves are permitted, the degree of deflection shall be in accordance with the pipe manufacturer's recommendations.
(5) No pipe shall be laid in water or when the trench conditions or weather is unsuitable for such work.
(6) All types of pipe joints shall be installed in strict accordance with the recommendations of the joint manufacturer.
(7) No jointing of pipe on the bank or out of position as to line and grade will be permitted without prior approval of the manager of development services.
(8) The smoothness of the interior joint shall be determined by some suitable device, and no pipe shall be finally set until the inverts coincide. Maximum permitted size spigots by ASTM specifications shall not be joined with the minimum permitted size sockets.
(9) Wyes and tees will be inserted or proper opening provided in the pipe lines wherever the manager of development services may direct. All branches thus inserted unless connected with a service lateral, shall be closed by means of ductile iron, cast iron or PVC plugs. After a cover or a plug has been placed in any wye of tee, it shall be completely sealed with jointing compound so as to be watertight. All pipe for laterals shall be marked with metalized tape buried between 18 and 24 inches below ground.
(10) In pipes over eight feet in depth or whenever the manager of development services may direct, the tee or wye stacks (of an approved material) shall be extended from the connections at an angle of 45 degrees from vertical, and the end shall terminate a minimum of four feet below the ground surface. Where laterals are specified on the plans or as required by the manager of development services, they shall be laid to the existing property line or as the manager of development services may direct. The ends of stacks or laterals shall be closed with covers as specified for wye branches. A metal locating strip shall be placed as for wyes and tees.
(11) Whenever the pipe laying is stopped for the night or for any other cause, the end of the pipe shall be securely closed with a stopper to prevent the entrance of unsuitable material, and shall be secured to prevent the end pipe from being dislodged by movement of the placed backfill.
(12) Wherever service laterals are intercepted by the excavation for the new sewer pipe line, connection shall be maintained temporarily to the old sewer pipe line until the particular section of the new lines is completed, tested and approved by the manager of development services. The service lateral shall then be broken and reconnected to the new sewer line through the appropriate opening which have been placed in the line for that purpose. The dead end of the service lateral from the old sewer line shall be capped with a plug and Portland cement mortar as close as practical to the side of the excavation from which it emerges. If considered necessary by the manager of development services, a special concrete support will be constructed to support the plug.
(13) After each pipe section is laid, it shall be partly backfilled and made secure before the joint connection is poured and made.
(14) Workmen shall not walk or stand upon the newly laid pipe until the necessary backfill has been placed and tamped to prevent pipe displacement.
(15) Rubber boots shall be installed at the pipe/manhole connection as well as where two different types of pipe are connected.
(h) Backfill.
(1) Before backfilling any trench, the manager of development services shall examine the completed line and all joints and the contractor shall correct any deficiencies that exist. The manager of development services shall be given a 48-hour opportunity to inspect the work and report deficiencies prior to backfilling.
(2) No trenches or excavations shall be backfilled until concrete placed in the structures has acquired a suitable degree of hardness and the work shall be prosecuted expeditiously after it has been commenced.
(3) All backfilling material shall be carefully selected to insure that it is free from roots, rocks or other unsuitable material and shall have a moisture content which will facilitate compaction.
(4) Selected backfill material from the excavation shall be placed alongside the pipe in layers not exceeding four inches in loose depth until at least two feet above the top of the pipe, then eight inch[es] in loose depth. Care shall be taken to ensure thorough compaction of the fill under and around the haunches of the pipe.
a. Where a layer of soil material is too dry to achieve required compaction, uniformly apply water to layer as necessary to bring moisture within limits which permit compaction to at least the specified densities.
b. Do not place backfill or fill material on surfaces that are muddy, frozen or contain frost or ice.
c. All backfill or fill material shall be placed carefully to avoid damaging the pipe or to prevent wedging action of the backfill against the pipe. Place backfill uniformly around the pipe or structure to approximately the same elevation in each lift.
d. Compaction may be done with mechanical rammers or by hand tamping with heavy tampers with the tamping face of which shall not exceed 25 square inches.
(5) Achieve not less than the following percentages of maximum density of soil material compacted at optimum moisture content for each layer of soil material in place as determined by AASHTO T-99.
a. Right-of-way: Conform with more stringent requirements of the permit issuing authority and the requirements herein.
b. Backfill under all existing or proposed pavement for streets, sidewalks, or roadways except pavement under the jurisdiction of the state department of transportation shall be backfilled as hereinafter specified. After the pipe has been backfilled to a point two feet above the top of the pipe, the remainder of the trench shall be backfilled to the ground surface with material from the excavation.
Backfill shall be placed in uniform layers not exceeding six inches in thickness.
c. The trench from two feet above the top of the pipe to within two feet of the top of the trench shall be compacted to not less than 95 percent maximum density as determined by AASHTO T-99. The remainder of the trench to within eight inches of the finish grade shall be compacted to not less then 95 percent maximum density. The top eight inches of the trench shall be compacted to not less than 100 percent maximum density as determined by AASHTO T-99. Where pavement is not replaced the top six inches of backfill shall be of a select, granular material.
d. Under and within two feet horizontal distance of paved walks, compact top six inches of subgrade and each layer of backfill and fill material to 95 percent of maximum density.
e. Under and within two feet horizontal distance of traffic using surfaces, compact layer of backfill and fill material to 95 percent of maximum density.
f. Under lawn and unpaved areas compact each layer of backfill or fill material to 85 percent maximum density.
(6) Connection of any newly installed lines shall not be made to existing lines or manholes until all sediment and water in the new lines has been removed and the work approved by the manager of development services.
(7) Sand: Flooding or jetting will be permitted where the clay and silt content of the backfill material is low enough to permit this method of consolidation. When allowed this method will be used from a point two feet above the top of the pipe to the original ground line.
(8) Muck: Flooding or jetting will be permitted or required where the clay or silt content or water content is so high as to make tamping ineffective. Flooding or jetting will be confined to that portion of the trench starting two feet above the top of pipe and ending two feet below the original ground surface. The last two feet shall be backfilled with selected earth and shall be mechanically rolled or tamped to the degree of compaction of the surrounding ground.
(i) Encasement pipe.
(1) Encasement pipe shall be installed by a dry boring method in which the casing pipe is place simultaneously with the boring action.
(2) Inspect the roadway or track directly above the work before, during and after the placing of the encasement for settlement. If settlement occurs, bring the roadway or track surface to its original grade by means approved by the manager of development services.
(3) After the carrier pipe has been installed in the encasement pipe, the space between the encasement pipe and the carrier pipe shall be filled with sand to the full encasement pipe diameter. In no case will blocking between the encasement pipe and the carrier pipe be permitted. Do not permit the encasement pipe to fill with water after the carrier pipe is installed and prior to placing of sand fill. If the carrier pipe is displaced by flotation, it shall be reinstalled to line and grade. The ends of the encasement pipe shall be sealed with an approved masonry plug.
Historia
(Ord. of 9-18-2000(2), § 38-217; Res. No. LD05-A037, 9-23-2005)