Leesburg · Ordenanza de zonificación
Appendix C - LAND DEVELOPMENT REGULATIONS / Article XI - SANITARY SEWAGE REQUIREMENTS / Division 2 - SANITARY SEWER STANDARDS AND SPECIFICATIONS
Sec. 11.07. Sewer system design criteria.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Minimum design criteria.
(1) When sewer mains cross water mains a minimum vertical separation of 18 inches shall be provided between the outsides of the pipes.
(2) At sewer main and water line crossings, one full length of sewer pipe (20 feet) must be centered directly under the water line.
(3) For crossing of new construction of sewer mains and water lines, the water lines shall be on top of the sewer mains.
(4) Sewer mains must be laid at least ten feet horizontally from any existing or proposed water line. Where it is not practical to maintain the ten-foot separation, the water main must be laid in a separate trench and that the bottom of the water line be at least 18 inches above the top of the sewer line.
(5) Only ductile iron is to be used within 20 feet of the bank of any stream.
(6) Mains, service lines, structures, etc., shall not be located on or in close proximity to an existing or abandoned landfill site of any other site used for waste disposal.
(b) Locations.
(1) Sewer mains when located in the right-of-way or adjacent utility easement will be located on the opposite side of the road when water lines are present.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.