Ir al contenido
Georgia Commons
Menú

Leesburg · Ordenanza de zonificación

Appendix A - ZONING / Article IX - SIDEWALKS IN EXISTING SUBDIVISIONS

Sec. 9.04. Monthly billing.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Upon installation of the sidewalk system in the subdivision, the city manager shall determine the actual total installation cost of the sidewalk system incurred by the city. Upon complete installation of the sidewalk system, the city's utility billing department shall add the sidewalk construction fee to each monthly city garbage collection fee bill for each lot owner of record in such subdivision, regardless of whether the lot owner signed the petition. The fee shall be calculated by calculating the total cost to the city for installation of the sidewalk system and dividing that total cost divided by the total number of lots in the subdivision. That amount shall constitute the cost of the sidewalk construction for each lot owner, and each lot owner shall pay such amount in 36 equal consecutive monthly installments in the same manner and at the same time as such lot owner pays his monthly garbage collection fee bill. In the event that a person or entity owns more than one lot, then he shall be obligated to pay the monthly fee for each lot he owns in the subdivision.

(b) In the event that there is no monthly city garbage collection fee charged as to any particular lot or lots in such subdivision, then the city shall bill the lot owner such monthly fees computed on an annual basis beginning the first month after final installation of the sidewalk system as contemplated herein. Except as otherwise provided herein, such fee shall be paid by each lot owner of record in the same manner as garbage collection fees are paid and shall be subject to collection in the same manner as garbage collection fees are collected by the city.

(c) All required repairs to the sidewalk constructed under this section shall be made by and at the expense of the city.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:leesburg/zoning/appendix-a-article-ix-9.04@2026-11-11-aa145762cc

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Leesburg Zoning Ordinance, Sec. 9.04 (Appendix A, Article IX). Monthly billing | Georgia Commons