Louisville · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 46 - ZONING / Article V - SUPPLEMENTARY REGULATIONS
Sec. 46-182. Required buffers between residential, commercial and industrial zoning districts.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) When two adjoining properties are in different residential, commercial or industrial zoning districts, the property within the zoning district allowing for more intensive uses is required to provide the buffer when acquiring a building permit unless the buffer was preexisting. When two adjoining vacant parcels are in different zoning districts, no buffer is required when the parcel zoned for the less intensive use acquires a building permit.
(b) The required buffer shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings plus a wall (not otherwise part of a structure or accessory building), fence or a berm, or any combination thereof, which meets the screening standards in section 46-187.
Historia
(Ord. of 8-11-1998, § 9-6.2)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.