Ir al contenido
Georgia Commons
Menú

Lovejoy · Ordenanza de zonificación

Appendix A - ZONING / Article XVII - TELECOMMUNICATION TOWERS AND ANTENNAS

Sec. 1705. Conditional use permits required.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. General. The installation of all antennas and the location of all towers within the city shall require a conditional use permit for every zoning district. The following provisions shall govern the application and consideration for granting conditional use permits:

(1) Conditional use permits shall be applied for and considered in accordance with article XIV of this appendix;

(2) In considering a conditional use permit, the council may impose conditions to the extent the council concludes such conditions are necessary to minimize any adverse effect the proposed antenna or tower may have on adjoining properties; and

(3) Any information of an engineering nature that the applicant submits, whether civil, mechanical, or electrical, shall be certified by a licensed professional engineer.

b. Information required. Each applicant requesting a conditional use permit under this article shall submit a scaled site plan, elevation view, and other supporting drawings, calculations, and documentation, signed and sealed by appropriate licensed professionals, showing the location and dimensions of all improvements. Additionally, information may be required by the council concerning topography, radio frequency coverage, tower height requirements, setbacks, drives, parking, fencing, landscaping, adjacent uses, and any other information deemed by the council to be necessary to assess compliance with this article.

c. Factors considered in granting conditional use permits. The council shall consider the following factors in determining whether to issue a conditional use permit. Provided, however, the council may vary any of such factors if the council concludes that the goals of this article are better served thereby.

(1) Height of the proposed antenna or tower;

(2) Proximity of the antenna or tower to other structures and zoning district boundaries;

(3) Nature of uses on adjacent and nearby properties;

(4) Surrounding topography,

(5) Surrounding tree coverage and foliage;

(6) Design of the antenna or tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;

(7) Availability of suitable existing antennas or towers and other structures;

(8) Proximity of the antenna or tower to other antennas or towers; and

(9) Such other and additional standards of review as are set forth in section 1506.

d. Availability of suitable existing antennas, towers, or other structures. No new antennas or towers shall be permitted, unless the applicant demonstrates to the reasonable satisfaction of the council that no existing antenna, tower, or structure can accommodate the applicant's proposed antenna or tower.

Evidence submitted to demonstrate that no existing antenna, tower, or structure can accommodate the applicant's proposed antenna, tower, or structure may consist of any of the following:

(1) No existing antennas, towers, or structures are located within the geographic area required to meet applicant's engineering requirements;

(2) Existing antennas, towers, or structures are not designed to meet applicant's engineering requirements;

(3) Existing antennas, towers, or structures do not have sufficient structural strength to support applicant's proposed antenna and related equipment;

(4) The applicant's proposed antenna would cause electromagnetic interference with the antenna on the existing towers or structures, or the antenna on the existing towers or structures would cause interference with the applicant's proposed antenna;

(5) The fees, costs, or contractual provisions required by the owner in order to share an existing tower or structure, or to adapt an existing tower or structure for sharing, are unreasonable. Costs exceeding new tower development are presumed for the purposes of this paragraph to be unreasonable;

(6) Property owners or owners of existing towers or structures are unwilling to reasonably accommodate the applicant's needs; and

(7) The applicant demonstrates that there are other limiting factors that render existing towers and structures unsuitable.

e. Setback and separation. The following setback and separation requirements shall apply to all antennas and towers. Provided, however, the council may, in its sole discretion, grant a variance to reduce the standard setback and separation requirements if the goals of this article would be better served thereby.

(1) Antennas and towers must be set back a distance equal to the height of the respective antenna or tower from the boundary line of any residential zoning district (effectively creating a buffer equal to the height of the antenna or tower); and

(2) Antennas, towers, guys, and accessory facilities must satisfy the minimum zoning district setback requirements.

f. Security fencing. Antennas and towers shall be enclosed by security fencing not less than six feet in height and shall also be equipped with an appropriate anti-climbing device. Provided, however, that the council may vary such requirements, as it deems appropriate.

g. Buffers and landscaping. The following requirements shall govern the buffers and landscaping surrounding antennas and towers. Provided, however, that the council may vary such requirements if the goals of this article would be better served thereby.

(1) Antenna and tower facilities shall be landscaped with a buffer of plant materials that effectively screens the view of the antenna or tower compound from adjacent residential property. The standard buffer shall consist of a landscaped strip at least 25 feet wide outside the perimeter of the compound;

(2) Buffer reductions may be allowed when existing mature tree growth and natural land forms on site are preserved to the stances where such antennas or towers are located on large wooded lots, natural growth around the property perimeter may be a sufficient buffer; and

(3) Existing mature tree growth and natural land forms on the site shall be preserved to the maximum extent possible.

h. Conditional use permits not required. The following uses are specifically permitted without a conditional use permit:

(1) Installing an antenna (excluding a microcell) on an existing alterative tower structure, or structure other than a tower (such as a building, sign, light pole, water tower, or similar freestanding non-residential structure), that is 50 feet in height or greater, so long as the additional antenna adds no more than 20 feet to the height of the existing structure;

(2) Installing a microcell on an existing alterative tower structure, or non-residential structure other than a tower (such as a building, sign, fight pole, water tower, or similar freestanding structure), so long as the microcell adds no more than six feet to the height of the existing structure; and

(3) Installing an antenna on any existing tower of any height, so long as the addition of the antenna adds no more than 20 feet to the height of the existing tower. Such specific permitted use shall also include the placement of any additional building or other supporting equipment used in connection with the antenna. Provided, however, the additional building shall be consistent in type of exterior material and quality of design and construction with any other building constructed upon the premises. The criteria relative to consistency with an existing building and to which existing building, if more than one building previously exists, shall be within the sole discretion of the department.

Removal of abandoned antennas, towers, or structures. Any antenna, tower, or structure that is not operated for a continuous period of 12 months shall be considered abandoned, and such antenna, tower, or structure shall be removed within 90 days of receipt of notice from the department notifying the owner of such abandonment. If such antenna, tower, or structure is not removed within 90 days, the department may, in the manner, provided in O.C.G.A. §§ 41-2-8—41-2-17, remove such antenna or tower at the owner's expense.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lovejoy/zoning/1705@2026-11-11-1fd59636bd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Lovejoy Zoning Ordinance, Sec. 1705. Conditional use permits required | Georgia Commons