A. The final plat will be presented to the mayor and council for dedication of public improvements only after the following items have been submitted and completed:
1. Application for final plat approval.
2. Final plat prepared for recording drawn to the requirements of this chapter.
3. Copies of all material test results for base and asphalt paving.
4. Verification by the building and code enforcement department and public works
department that all required inspections have been made and approved and the
improvements to the subdivision, including street construction, sidewalks, drainage systems, and right-of-way seeding, are in compliance with approved plans,
all underground utilities have been installed; and street and traffic signs are installed.
5. Verification that the soil erosion and sedimentation control for the subdivision is in compliance with the approved soil
erosion and sedimentation control plan.
6. Verification by the water and sewer department that all requirements have been met, including submission of required documents and inspections.
7. Two-year maintenance bond or letter of credit.
8. As-built drawings of all water and sewage facilities submitted to and approved by
the city engineer.
9. Septic system permits provided by the health department (for developments not
using a sanitary sewer system).
10. As-built drawings of streets, and sidewalks, including: the existing center line profile of all newly constructed streets;
and the top and invert elevations of all drainage structures.
11. As-built construction improvements plans for storm sewers with grade, pipe sizes
and points of discharge.
12. As-built construction improvements plans for storm drainage system with grade,
pipe sizes and location of outlets and other drainage structures, street profiles and storm water management facilities.
13. As-built construction improvements plans for water distribution systems with pipe sizes and locations of hydrants and valves.
14. Protective covenants or deed restrictions, if any, attached in form for recording.
B. The as-built drawing(s) shall be prepared by a registered professional engineer or landscape architect and a surveyor at a minimum scale of 100 feet to the inch.