Appendix B - DEVELOPMENT ORDINANCE / Chapter 4 - IMPROVEMENT STANDARDS

Section 4.24. Construction requirements for residential subdivisions streets.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. The design and construction requirements for residential subdivisions shall comply with the minimum standards shown in table 4-1.

B. The grading, base and pavement for residential street construction shall be as follows:

1. Grading. All streets shall be graded to the elevations shown on the approved construction plans.

a. Clearing and grubbing. After the development permit has been issued, a preconstruction conference has been held, the city engineer duly notified, and all required silt and erosion control measures installed and approved, the contractor may begin clearing and grubbing the project. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project. A 30-foot undisturbed buffer shall be maintained on all property lines prior to submission of construction improvements plans. No rubbish or other material resulting from the clearing and grubbing of the roadway may be buried within the construction limits of the roadway or detention ponds. If burning is permitted, all burn pits must be located outside

of the roadway construction limits.

b. Excavation. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material in the top 12 inches of the roadway. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and

backfilled with suitable material.

All rock and boulders in the roadbed shall be excavated to a depth of at least 12 inches below the subgrade and the space backfilled to the correct grade with suitable material.

Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the development inspector and then under his supervision.

During the construction of the roadway on a day to day basis, the roadbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill will be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes.

c. Placement of fill. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill is begun. The entire area upon which

fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches.

Before the placement of fill material is begun, all loosened soil shall be compacted the approximate

density of the underlying soil. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted the approximate density of the underlying soil. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative samples of the material being compacted. In areas where layers of organic or other unstable materials exists, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material. All fill material shall be deposited and spread in uniform

horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment. Each layer shall be

compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too

much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil

before it is compacted. Fills shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill. The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers. While the work is in progress, [the] contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface.

d. [Equipment on site]. The contractor shall have available on the job at all times at least one motor patrol grader with adequate power to blade and maintain the roadbed. Suitable scarifiers shall also be available for use whenever necessary.

e. Final finishing of roadway. After all excavation has been completed and all fills have been placed, the entire road bed surface shall be finally shaped with a grading machine supplemented with hand work whenever required, to secure a smooth surface and uniform crosssection. Slopes of cuts and fills shall also be carefully shaped to the true

section specified. When final shaping is finished, the road surface shall conform accurately to the line,

grade and cross section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top 12 inches of the finished road bed. All ditches and drains shall be opened to effectively drain the roadway.

2. Placement of curb and gutter. After sanitary sewer and water lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the city engineer, the installation of the concrete curb and gutter may begin. All concrete curb and gutter shall be in accordance with Manchester construction standards.

Any curb and gutter which does not conform to a true section, texture, line and grade shall be removed and replaced as directed by the development inspector.

3. Subgrade. Before placing any pavement base the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six inches. If a subgrade stabilization material is required it shall be incorporated into the subgrade

at this time. After the material has been thoroughly mixed the subgrade shall be brought into a proper line and grade and compacted to 100 percent of maximum dry density just prior to placing the base material. The centerline profile shall conform to the established elevations with an acceptable tolerance of one-half inch. The acceptance crown tolerance shall be one-half inch.

4. Base construction. The city engineer shall be notified 24 hours prior to the placing of any of the base material. After the inspector is satisfied all the equipment necessary for the proper construction of road base is on the proper line, grade, and crown, and compacted to the required density, he may authorize the placing of the base material. After the base material has been placed and compacted to the required density the city engineer

will check the completed base course. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or

the exposed edge of the concrete gutter is less than the minimum depth required, shall be reshaped and rolled to obtain the required cross-section. After the compacted material has been approved, cores shall be taken as directed by the development inspector to determine the thickness of the constructed base course.

Areas found to be deficient in thickness shall be corrected as directed by the development inspector. A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to the placing [of] any asphaltic concrete paving material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be increased. All work and materials shall be in accordance with the pertinent Graded Aggregate Construction sections of the Georgia Department of Transportation "Standard Specifications..." latest edition.

5. Paving. After the road base has been accepted by the development inspector and upon his approval the contractor shall begin the construction of the asphaltic concrete pavement. All asphaltic concrete material and construction shall be in accordance with the Hot Mix Asphaltic Concrete Construction sections of the Georgia Department of Transportation "Standard Specifications..." latest edition. After the material has been placed and rolled to the satisfaction of the inspector he shall check the cross section of the finished pavement.

Any area found to be deficient shall be marked and a record of deficiencies made by the development inspector.

6. [Overlay.] If, in the opinion of the city engineer, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one inch be placed before the roadway is opened to traffic. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the development inspector at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated the development inspector may require a minimum one inch overlay of the streets.

7. [Core tests.] Upon acceptance of the surface course by the city engineer, the developer

shall have core tests made as directed by the city, to verify the thickness of the street base and asphalt pavement. If these indicate a deficiency in thickness of the street base and asphalt pavement an overlay shall be required when the following deficiencies occur:

a. When the number of cores deficient in thickness with the allowable onequarter of an inch tolerance exceeds 35 percent of the total cores taken

on one street.

b. When two or more consecutive tests show a deficiency of more than onequarter of an inch allowable tolerance. When a core shows a deficiency in excess of the allowable tolerance

additional cores will be taken to delineate the area of the deficient thickness.

c. Any required overlay shall extend a minimum of 150 feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement overlay. The thickness of the overlay shall be determined by the depth of the

deficient area and shall not be less than one inch in compacted thickness. The type of material used in the overlay shall be specified by the

county.

d. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched.

An 80 percent stand of grass must be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to 95 percent of maximum dry density.

_______________________________________________________________________________________________

RESIDENTIAL SUBDIVISION STREET DEVELOPMENT STANDARDS Construction Specifications

1. Surface topping (plant mix) Two inch "E" or "F" asphalt topping, 220 pounds per square yard

2. Primer 0.15 gallons primer per square yard "MC" or "RC"

3. Curbs/shoulder and ditch construction Twenty-four inch by six inch concrete "L" back curb; 18-inch gutter; six inches high; six-inch curb width

4. Base construction Six-inch base (graded aggregate); 100 percent compaction

5. Street surface width Twenty-two feet pavement width with curb and gutter; 26 feet back of curb to back of curb.

6. Street base width Twenty-two feet with curb and gutter.

7. Street grade Twelve percent maximum on local streets; eight percent maximum on collector and minor arterial streets; five percent maximum on major streets;

four percent maximum grade at intersections for local streets; two percent for all other streets—100 feet from curb line.

8. Turnaround area Forty feet radius cul-de-sac pavement (80 feet diameter).

9. Intersections Twenty feet pavement radius at intersection within subdivision.

Twenty-five feet pavement radius required where intersecting existing city or county roads.

10. Right-of-way 60 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for cut and fill areas).

One hundred and ten feet diameter right-of-way for cul-de-sac.

11. Fill areas and back slopes 2:1 maximum slope allowed

12. Storm sewers and cross drains GDOT materials specifications; coated metal pipe required; pipe location and size will be approved by the community development department.

13. Grassed areas Shall comply with the Manchester Soil Erosion and Sedimentation Control Ordinance.

14. Core testing Core samples will be taken as directed (at developer's expense) to determine thickness of base and pavement.

15. Maintenance bond Three-year maintenance bond or letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catch basins, cross drains) and storm water detention facilities.

INDUSTRIAL, COMMERCIAL/OFFICE SUBDIVISIONS AND ARTERIAL ROADS Construction Standards Industrial Subdivisions Commercial/Office Subdivisions

1. Surface topping plant mix One and one-half inch "E" or "F" asphalt topping, 165 pounds per

square yard.

Two inch "E" or "F" asphalt topping 220 pounds per square yard.

2. Binder Three-inch binder-330 pounds per square yard None

3. Prime coat 0.15 gallons primer per square yard

4. Curbs/shoulder and ditch Construction (curb and gutter) required for commercial/industrial subdivision street Twenty-four inch by six-inch concrete "L" back curb; 18 inch gutter; six inch high; six inch curb width. Ditch and shoulder improvements; five feet wide grassed shoulders with threefourth inch per foot slope; 2:1 maximum drainage ditch slope

and two-foot minimum depth from outer edge of shoulder.

Twenty-four inch by six-inch concrete "L" back curb; 18 inch gutter; six inch high; six inch curb width. Ditch and shoulder improvements; five feet wide grassed shoulders with threefourth inch per foot slope; 2:1 maximum drainage ditch slope

and two foot minimum depth from outer edge of shoulder.

5. Base construction Eight inch base graded aggregate.

One hundred percent compaction.

Eight inch base graded aggregate.

One hundred percent compaction.

6. Street surface width Thirty feet width with curb and gutter; back of curb.

Twenty-eight feet width with curb and gutter; back of curb.

7. Street base width Twenty-six feet. Twenty-four feet.

8. Street grade Eight percent maximum on collector and minor arterial streets;

five percent maximum on major streets; two percent maximum grade at intersections; 100 feet from curb line.

Eight percent maximum on collector and minor arterial; five percent maximum on major streets; two

percent maximum grade at intersections; 100 feet from the curb line.

9. Turnaround area Fifty-five feet radius cul-de-sac pavement; 110 feet diameter.

Fifty-five feet radius cul-de-sac pavement; 110 feet diameter.

10. Intersections Fifty feet pavement radius at intersections; 50 feet straight section from curved streets required.

Fifty feet turning radius at intersections; 50 feet straight section from section from curved streets required.

11. Driveway entrances GDOT specifications GDOT specifications

12. Right-of-way Fifty feet right-of-way minimum;

additional right-of-way or slope easement may be required for cut and fill areas; 140 feet diameter right-of-way for cul-de-sac.

Fifty feet right-of-way minimum;

additional right-of-way or slope easement may be required for cut and fill areas.

13. Fill areas and back slopes 2:1 maximum slope allowed. 2:1 maximum slope allowed.

14. Storm sewers and cross drains GDOT materials GDOT materials Drains Specifications: coated metal pipe

required, pipe location and size be approved by the city.

Specifications: coated metal pipe required, pipe location and size be approved by the city.

15. Grassed areas Shall comply with the Manchester Solid Erosion and Sedimentation

Control Ordinance.

Shall comply with the Manchester Soil Erosion and Sedimentation Control Ordinance.

16. Core testing Core samples will be taken as directed to determine thickness of

base and pavement (at developer's expense) Core samples will be taken as directed to determine thickness of base and pavement (at developer's expense).

Construction Standards Industrial Subdivisions Commercial/Office Subdivisions

17. Maintenance bond or letter of credit Two-year maintenance bond or letter of credit bond or letter of credit on improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catch basins, cross drains) stormwater detention facilities.

Two-year maintenance bond or letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and

storm sewer, catch basins, cross drains) stormwater detention facilities.

_______________________________________________________________________________________________

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:manchester/zoning/4.24@2026-11-11-f2256df2a4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Manchester Zoning Ordinance, Section 4.24. Construction requirements for residential subdivisions streets | Georgia Commons