7-8-14-010. General provisions.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Purpose and Intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post-construction stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. Additionally, the City of Marietta is required to comply with several state and federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related

to managing the water quantity, velocity, and quality of post-construction stormwater runoff.

B. Adoption and Implementation of the Georgia Stormwater Management Manual; Conflicts and Inconsistencies.

1. In implementing this article, the City of Marietta shall use and require compliance with all relevant design standards, calculations, formulas, methods, and other

guidance from the Georgia Stormwater Management Manual ("GSMM"), as well as all related appendices.

2. This article is not intended to modify or repeal any other article, ordinance, rule, regulation or other provision of law, including, but not limited to, any applicable stream buffers under state and local

laws, and the Georgia Safe Dams Act and Rules for Dam Safety. In the event of any conflict or inconsistency between any provision in the City of Marietta's Municipal Separate Storm Sewer System ("MS4") permit and this article, the provision from the MS4 permit shall control.

In the event of any conflict or inconsistency between any provision of this article and the GSMM, the provision from this article shall control. In the event of any other conflict or inconsistency between any provision of this article and any other ordinance, rule, regulation or other provision of law, the provision that is more restrictive or imposes higher protective

standards for human health or the environment shall control.

3. If any provision of this article is invalidated by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of this article.

C. Designation of Administrator. The public works director is hereby appointed to administer and implement the provision of this article. The public works director may, from time to time, appoint someone to administer and implement this article.

D. Applicability Criteria for Stormwater Management Standards. This article applies to the following activities:

1. New development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land-disturbing activity of one acre of land or greater;

2. Redevelopment, excluding routine maintenance and exterior remodeling, that creates, adds, or replaces 5,000 square feet or greater of new impervious surface area or that involves land-disturbing activity of one acre or greater;

3. New development and redevelopment if:

a. Such new development or redevelopment is part of a subdivision or other common plan of development;

and

b. The sum of all associated impervious surface area or land-disturbing activities that are being developed

as part of such subdivision or other common plan of development meets or exceeds the threshold in 1. and 2.

above;

4. Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined

in this article; and

5. Linear transportation projects that exceed the threshold in 1. or 2. above.

E. Exemptions from Stormwater Management Standards. This article does not apply to the following activities:

1. Land-disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or

conduct emergency repairs;

2. Land-disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;

3. Land-disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or

environmental restoration;

4. Repairs to any stormwater management system deemed necessary by the administrator;

5. Agricultural practices as described O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in Subsection D.1.

or 2.;

6. Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in Subsection D.1. or 2.;

7. Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including, but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or

exits; and

8. Linear transportation projects being constructed by the City of Marietta to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant

with the City of Marietta's linear feasibility program shall first be submitted to the administrator that contains adequate

documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 8204, 12/9/2020, § 1)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marietta/zoning/7-8-14-010@2026-11-11-71b18cba73

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marietta Zoning Ordinance, 7-8-14-010. General provisions | Georgia Commons