Ir al contenido
Georgia Commons
Menú

Marietta · Ordenanza de zonificación

Part 7 - PLANNING AND DEVELOPMENT / Chapter 7-8 - COMPREHENSIVE DEVELOPMENT CODE / Article 7-8-8 - HISTORIC DISTRICT

7-8-8-050. Certificate of approval required.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Except as provided hereafter, a certificate of approval issued by the city upon order of the board of review shall be required before any of the following is commenced within the historic district:

1. The demolition of any building designated as historic. Provided, however, that the action of the historic board of review shall constitute a recommendation and no certificate of approval hereunder shall become final until approved by the Marietta City Council. Further provided, however, that any certificate of approval approved by the city council must be implemented by the issuance of a building permit and commencement of substantial and ongoing construction

within the period of 12 months from the date of final approval by the city council and if the issuance of a building permit and substantial and ongoing construction is not so commenced the final certificate issued by the city council shall

expire and be void at the end of the 12-month period.

The following additional requirements shall be met:

a. Except as provided in Subsection c., below, any applicant requesting a demolition permit shall be required to provide a date certain for the commencement of new construction of a new building to replace the demolished building which shall be no greater than 90 days from the completion of demolition.

b. Any applicant requesting a demolition permit shall be required to brick, stucco or otherwise reface

any and all deteriorating walls that are open to public viewing as part of the demolition permit if no date certain exists to build a new structure or if due to other circumstances a new structure cannot be built in a manner provided in Subsection a., above.

c. Any applicant requesting a demolition permit who certifies that a new building will not be constructed on

the demolition site shall restore the site within 30 days of completion of demolition to a condition which is safe, properly drained, stabilized, grassed and otherwise in compliance with this Code.

2. The moving or relocation of any historic building.

3. Except housecleaning, any material work on the exterior appearance of existing buildings classified as historic by additions, reconstruction, rehabilitation, alteration, or any maintenance (including exterior color), or any material exterior changes.

4. Any new construction of a building or accessory building or structure subject to view from a public street. Provided, however, that the action of the historic board of review regarding new construction shall constitute a recommendation and no certificate of approval hereunder

shall become final until approved by the Marietta City Council. Further provided, however, that any certificate of approval approved by the city council for new construction must be implemented by the issuance of a building permit and commencement of substantial and ongoing construction within the period of 12 months from the date of final approval by

the city council and if the issuance of a building permit and substantial and ongoing construction is not so commenced the final certificate issued by the city council

shall expire and be void at the end of the 12-month period.

5. Changes in existing walls, fences, steps, sidewalks, streets and paving, or construction of new walls or fences, steps, sidewalks, streets and paving, if along

public street rights-of-way, public lanes or public alleys.

6. Material work on the exterior appearance of existing contemporary buildings by additions, reconstruction, alteration,

rehabilitation or maintenance (including exterior color), subject to view from a public street or walk.

7. The erection or display on any lot, building or structure of any sign, light or other appurtenant fixture.

B. An approved certificate of approval must be implemented by the issuance of a building permit (when required by this Code) and the commencement of substantial and ongoing construction within a period of 12 months from the date of approval and if the issuance of a building permit (when required by this Code) and the substantial and ongoing construction is not so commenced, the certificate shall expire at the end of the 12-month period. Notwithstanding any other provision under this Code section, all actions permitted shall be governed by the

applicable construction codes and ancillary ordinances governing construction as of the date of the issuance of the permit.

C. An application for a certificate of approval affecting the same property shall not be submitted, reviewed, amended, filed or considered more than once every six months; provided, however,

this restriction shall not apply to items A.5., A.6.

and A.7., above. Provided, further, that the holder of any previously approved and valid certificate of approval may petition the Marietta City Council for a waiver to file an application with the historic board of review to amend said existing certificate of approval.

D. Any and all certificates of approval issued prior to January 8, 2010, shall expire 90 days from the date of adoption of this ordinance [October 12, 2011].

E. Exemptions.

1. Improvements made within the right-ofway or upon government-owned property shall be exempt from the provisions of

this article.

2. Temporary modifications to any existing buildings or structures resulting from a permit issued under the Motion Picture, Television and Photographic Production Ordinance (Article 5-13). All modificaPLANNING AND DEVELOPMENT 7-8-8-050 tions, including paint color, will be restored

to the condition that existed immediately prior to the change, or better; and any such modifications will be completed within ten days of completion of filming.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 7563, 10/12/2011, § 1; Ord. No. 8057, 11/14/2018, § 1; Ord. No. 8279, 6/8/2022, § 1)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marietta/zoning/7-8-8-050@2026-11-11-1c30c3a1e1

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marietta Zoning Ordinance, 7-8-8-050. Certificate of approval required | Georgia Commons