Part 7 - PLANNING AND DEVELOPMENT / Chapter 7-8 - COMPREHENSIVE DEVELOPMENT CODE / Article 7-8-12 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL

Sections 7-8-12-040

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

B. and C., or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The "Manual for Erosion and Sediment Control in Georgia" is hereby incorporated by

reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive

computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections

or any land-disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

2. Data required for the plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted.

D. Permits.

1. Permits shall be issued or denied as soon as practicable, but in any event, not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all

applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.

2. No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by Sections 7-8-12-040 C.15.,

16. and 17. are obtained; bonding requirements, if necessary, as per Section 7-8-12- 050 B.6. are met; and all ordinances and

rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be

furnished to the applicant.

3. Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.

4. If the tract is to be developed in phases, then a separate permit shall be required for each phase.

5. The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that

the holder or his successor in the title is not in compliance with the approved erosion, sedimentation and pollution plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.

6. The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and SedimentaPLANNING AND DEVELOPMENT 7-8-12-050 tion Act permit requirements within three

years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1).

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 8051, 10/10/2018, § 1)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:marietta/zoning/part-7-chapter-7-8-article-7-8-12-7-8-12-040-3@2026-11-11-97cbedd4fd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Marietta Zoning Ordinance, Sections 7-8-12-040 (Part 7, Chapter 7-8, Article 7-8-12, no. 3 so numbered) | Georgia Commons