Marion County · Ordenanza de zonificación
Appendix B - ZONING / Article XXII - ADMINISTRATION AND ENFORCEMENT
Sec. 22.02. Fees and fee schedule.
Sobre este texto
- As published by Municode, current through 2022-03-08
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Fees for inspections and the issuance of permits or certificates or copies thereof required or issued under the provisions of this chapter [appendix] shall be collected by the zoning administrator in advance of the issuance of such permits or certificates.
The amount of such fees shall be established by the Marion County Board of Commissioners, from time to time, and shall cover the cost of inspection and supervision resulting from the enforcement of this chapter [appendix]. The fees shall be deposited with the zoning administrator.
The following fee schedule is hereby established.
Schedule of Fees Item Fee [in dollars]
1. Amendments: Requests for revision to the text or map (rezone) 300.00
2. Appeal: Requests for a variance. Requests for variance which fall within the discretionary authority of the codes administrator shall not be assessed a fee.
225.00
3. Building Permit and Fee Schedule Manufactured homes and buildings moving and set up fees
A. Preinspection fee for any mobile home older than 10 years being moved from one location to another within the county. (This is in addition to moving fees.)
25.00
B. Singlewide 50.00
C. Doublewides 75.00 Schedule of Fees Item Fee [in dollars] Electrical inspection (Temporary or permanent power pole, replacement, repair or reconnection or new wiring not covered under any other building permits is a stand alone inspection.)
A. 200 amp service 30.00
B. Larger than 200 amp service 50.00
C. Reinspections In the case of failure of any initial inspection 30.00 Residential house
A. At or below 2,000 sq. ft. 250.00
B. 2001—4000 sq. ft. 350.00
C. 4001—Larger 450.00 Commercial building (sq. ft. based on "under roof" space, open or enclosed)
A. At or below 2,000 sq. ft. 250.00
B. 2001—4000 sq. ft 350.00 Agricultural building (Fee set with or without power/plumbing under roof)
A. Up to 1,000 sq. ft. 50.00
B. 1,001—2000 sq. ft. 100.00
C. 2,001—Larger 150.00 Industrial building(1) (A building used for the manufacturing of goods with square footage under roof)
A. 2,000—4000 sq. ft. 500.00
B. 4,001—Larger 1,000.00 Accessory building(2)
A. Up to 500 sq. ft. under roof
1. Without power or plumbing 30.00
2. With power or plumbing 50.00
B. 501-1,000 sq. ft. under roof
1. Without power or plumbing 60.00
2. With power or plumbing 100.00
C. Greater than 1,001 sq. ft
1. Without power or plumbing 120.00
2. With power or plumbing 200.00 Remodeling permit(3) Any remodeling done with value of under $1,500.00, no permit is required.
A. Value of $1,500 to $6,000 30.00
B. Value of $6,001 and above 60.00 Demolition permit
A. Residential sites (homes and manufactured homes) 25.00 Schedule of Fees Item Fee [in dollars]
B. Commercial sites 50.00
C. Industrial sites 100.00 Manufactured homes and buildings moving and set up fees
A. Preinspection fee for any mobile home older than 10 years being moved from one location to another within the county (This is in addition to moving fees)
25.00 Notes.
(1) This fee more or less covers the county's expenses in future code enforcement.
(2) Definition of containment: Any storage structure, gazebo, or outbuilding
(3) Value will be determined at highest amount unless owner can supply estimates showing actual value of work being done.
Any Building Permit shall automatically expire twelve (12) months from the date of issuance if the person, firm, or corporation to which the certificate or permit was issued has not clearly demonstrated that the permit is being exercised for the purpose for which it was issued, or the work so authorized is suspended or discontinued for a period of one (1) year.
All fees shall be in addition to the cost of any public notice which may be required.
Historia
(Ord. of 2-14-2006; Ord. of 6-13-2006)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.