Ir al contenido
Georgia Commons
Menú

McDonough · Ordenanza de zonificación

Part IV - : ENFORCEMENT AND PENALTIES / Title 17 - ZONING / Chapter 17.160 - TREE CANOPY CONSERVATION

17.160.060. Tree canopy replacement

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

requirements.

A. All trees planted to meet tree canopy replacement requirements shall be two and onehalf-inch caliper or larger and shall meet ANSI Z60.1 Standards for Nursery Stock, and all

planting shall be done in accordance with the current ANSI A300 Standards for Tree Care Operations, ANSI Z133 Safety Standards, and industry best management practices. Tree replace ment under this section shall be accomplished using trees of equivalent or better ecological value and quality on the tree species list.

B. A tree planting plan shall be submitted along with a tree removal permit application.

C. Removal of a protected tree without a valid tree removal permit shall be considered a violation of this section and subject to penalties described in Section 17.160.190.

D. Commercial, high density residential, and institutional alternative compliance.

1. For properties with less than forty-five

(45) percent tree canopy cover at the time of the permit application that require a land disturbance permit or where impervious area is increased, a tree conservation plan is required.

2. All existing trees in fair or better-rated condition located in public rights-of-way adjacent to the property must be conserved.

3. Additional tree canopy cover must be planted to achieve forty-five (45) percent tree canopy cover across the site, including tree canopy provided by streetscape installations on public rights-of-way. If

replacement trees are required, a minimum of fifty (50) percent of the property's tree canopy cover replacement must be accommodated on site, including adjacent public rights-of-way. The remaining fifty (50) percent may be satisfied by a combination of replacement trees

planted on city-owned property or in public rights-of-way, the installation of on-site green infrastructure, the installation of rooftop solar photovoltaic panels (PV), or, upon submission of an affidavit

from the property owner attesting that other options have been explored but are infeasible due to site conditions, a payment in lieu fee made to the tree bank.

E. Green infrastructure.

1. Green infrastructure may include, but not be limited to, bioretention, rain gardens, infiltration trenches, bioswales, permeable pavement, stormwater planters, subsurface infiltration, rainwater harvesting, cisterns, landscaped green

infrastructure, and other practices as described by the EPA.

2. No trees shall be removed for the installation of green infrastructure to satisfy the requirements of this section.

3. Green infrastructure installed to satisfy a portion of a property's tree canopy cover replacement requirement must not be otherwise legally required.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 25-01-02, § 1, 1-2-2025)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mcdonough/zoning/17.160.060@2026-11-11-f0631bc6bd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

McDonough Zoning Ordinance, 17.160.060. Tree canopy replacement | Georgia Commons