McDonough · Ordenanza de zonificación
Part IV - : ENFORCEMENT AND PENALTIES / Title 17 - ZONING / Chapter 17.92 - ADMINISTRATION AND ENFORCEMENT
17.92.023. Variance procedure.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. An application for a variance shall be filed with the director at least forty-five (45) days prior to the meeting of the BZA at which it is to be heard. Each application shall be accompanied by a plat drawn to scale containing the following information, in addition to any other pertinent information required by the director:
1. All property lines with dimensions.
2. Location of buildings and other structures, creeks and easements referenced to
property lines.
3. North arrow, scale, lot and block numbers and land lot.
4. Topographic and drainage information if pertinent.
B. Each application for variance shall be made in two (2) copies and shall specify the conditions and the extent of the variance sought as well as a statement demonstrating compliance with the required criteria for variance set forth below.
C. If the director determines that the request meets the minimum legal requirements for a variance, then the director shall provide for the scheduling of a hearing by the BZA and give public notice of said hearing in accordance herewith.
D. The BZA shall conduct the hearing on a properly noticed variance request and render a decision based upon the specific criteria set forth in Section 17.092.025.
E. The director shall notify the applicant, in writing, of the decision of the BZA.
Historia
(Ord. No. 25-01-02, § 1, 1-2-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.