McDuffie County · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 44 - LAND DEVELOPMENT CODE / Article VIII - ADMINISTRATION AND ENFORCEMENT
Sec. 44-164. Construction permit.
Sobre este texto
- As published by Municode, current through 2026-09-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Required. No building or other structure shall be constructed, erected, moved, added to or structurally altered in any way without a building permit that has been issued in advance.
Building permits shall only be issued as provided under this chapter. If construction of the building or structure has not begun within six months of the date of the issuance of the building permit, the permit shall become invalid. Details as to the type of permits required, and cost, may be found in appendix B [referred to herein by reference].
(b) Requirements. Unless otherwise directed by the development code administrator, every application for a building permit shall be accompanied by a copy of a scaled plan or, as applicable, a plat showing the lot dimension and corners; the shape size and location of all structures to be erected, altered or moved; all other structures on the lot; the existing and intended use of all such buildings or other structures; and any other such information required by the development code administrator. If all proposed actions conform to this chapter and applicable building codes, a building permit may be issued. Any reasons for disapproval shall be provided to the applicant.
Historia
(Ord. of 3-23-99, Art. VIII, § 5)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.