Meriwether County · Ordenanza de zonificación
Appendix A - ZONING / Article XIII - SURVEY OF COMPLETION OF IMPROVEMENTS
Sec. 1304. Default.
Sobre este texto
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
If the construction or installation of any improvements or facilities other than streets and drainage structures for which a bond or other surety is posted is not completed within three months after substantial completion of any buildings or structures which said improvements or facilities are designed to serve, or within two years after the date of recording of the final plat, whichever is sooner, or if said construction or installation is not in accordance with the applicable specifications and requirements using the proceeds from such surety deposits to pay for such work, such work may be done under contract or by county personnel. To the extent that any portion of a cash deposit is not required or used, said excess cash shall be repaid to the person making the deposit.
Historia
(Ord. No. 2020-03, § 1(Exh. A), 8-25-2020)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.