Meriwether County · Ordenanza de zonificación
Appendix A - ZONING / Article 4 - GENERAL PROVISIONS
Sec. 4.2. Use of buildings.
Sobre este texto
- As published by Municode, current through 2026-01-12
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No building or structure shall be erected, converted, enlarged, reconstructed, moved, structurally altered or used, except for a use permitted in the district in which such building or structure is located.
(1) Location of buildings. Every building hereafter erected, converted, enlarged, reconstructed, moved or structurally altered shall be located on lots as herein defined, except as approved by the planning commission In the form of a variance.
(2) Height of buildings. No building shall be erected, converted, enlarged, reconstructed, moved or structurally altered to exceed the height limit herein established for the district in which it is located, except for the following:
a. Chimneys.
b. Public monuments.
c. Church spires.
d. Tanks.
e. Fire towers.
f. Water towers.
g. Flagpoles.
h. Silos.
Public and semi-public service buildings, hospitals, institutions and schools may be erected to a height not to exceed 100 feet, if approved by Meriwether County. Churches and temples may be erected to a height not exceeding 75 feet, provided the required side yard and rear yards shall be increased by at least three feet for each one foot of additional building height above the height regulations for the district in which the building is located.
(3) Dimensional regulations. No building or use shall be erected, converted, enlarged, moved or structurally altered except in conformity with the minimum space requirements (e.g., the lot area, floor area, building height, etc.) for the district in which such building is located.
(4) Temporary buildings. Temporary buildings shall not be permitted in any district except when they are used in conjunction with construction work or pending completion of a permanent building, either commercial or residential. Such building shall be used for a period not to exceed one year and shall be removed when the construction of the permanent building is completed.
Construction of the permanent building is deemed complete at the issuance of a certificate of occupancy.
Historia
(Ord. No. 2020-04, § 1(Exh. A), 8-25-2020)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.