7-3. Drainage, Construction, and Maintenance.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All off-street parking, loading, and service areas shall be drained so as to prevent damage to abutting properties and/or public streets and shall be constructed of asphalt, concrete, solid brick pavers, or any other material approved by the building official with concurrence from the Fire Chief and the Public Works Director where applicable. All such areas shall be at all times maintained at the expense of the owners thereof, in a clean, orderly, dust-free, and deteriorated free condition.
7-3.1. Requirements for Unpaved Parking. Unpaved parking areas may be approved by the Building Official or his designee with conditions including, but not limited to, the following:
7-3.1.1. Unpaved spaces shall be located on the periphery of parking areas, in locations that will receive less use than those paved and more remotely located to the use served.
7-3.1.2. Stormwater management facilities shall be provided for all vehicular use areas, whether paved or unpaved. The developer must demonstrate that stormwater management facilities can be expanded to accommodate future required paving.
7-3.1.3. Use of the unpaved parking area shall not cause the introduction of sediment or debris onto city rights-of-way and easements.
7-3.2. Inspection. At least six months after a final certificate of occupancy is issued, an inspection will be made by the building official or designee. If findings indicate that the unpaved spaces are in good condition or are infrequently used, such unpaved spaces may remained unpaved. If findings show that the spaces receive as much use as the paved spaces, or have deteriorated, such unpaved spaces shall be paved within 90 days of written notice to the owner of the property. If paving is deemed necessary by the city engineer, the property owner may be required to expand the stormwater management facilities (as provided in section 7-3.1.2).