Sec. 5.20. Telecommunication antennas and towers.

Sobre este texto

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The purpose of this section is to establish standards and regulations for the siting of antennas and towers. The goals are to: (1) encourage the location of towers in nonresidential areas and minimize the total number of towers throughout the county, (2) encourage strongly the joint use of new and existing tower sites, (3) encourage locating towers and antennas, to the extent possible, in areas where the adverse impact on the community is minimal, (4) encourage configuration in a way that minimizes the adverse visual impact of the towers and antennas, (5) enhance the ability of the providers of telecommunications services to provide such services to the community quickly, effectively, and efficiently.

A. Each applicant requesting a conditional use permit for an antenna and/or tower will be required to submit:

1). Letter of authorization signed by the owner and notarized granting permission to the agent, with a copy of the lease agreement.

2). Plat of property and site plan showing approved drives, setbacks, and other ordinance requirements.

3). DOT/county driveway approval, as required.

4). FCC and FAA acknowledgement.

5). Inventory of existing tower sites that are within the county and within one-quarter mile of the border thereof, including specific information about the location, height, and design of each tower.

6). Documentation concerning prospective carrier(s).

B. The following shall govern the location of all towers and the installation of all antennas:

• Towers shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA, be painted a neutral color, so as to reduce visual obtrusiveness.

• At a tower site, the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and built environment.

• If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible.

• Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the governing authority may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. Telecommunication Towers and Antennas must be setback a distance equal to the height of the tower or antenna plus fifty (50) feet from all property lines.

C. Any antenna or tower that is not operated for a continuous period of 12 months shall be considered abandoned, and the owner of such antenna or tower shall remove same within 90 days of receipt of notice from the governing authority notifying the owner of such abandonment. If such antenna or tower is not removed within said 90 days, the governing authority may, in the manner provided in sections 41-2-8 through 41-2-17 of the Official Code of Georgia [O.C.G.A. §§ 41-2-8—41-2-17], remove such antenna or tower at the owner's expense. If there are two or more users of a single tower, then this provision shall not become effective until all users cease using the tower.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2006-004, § 1, 8-8-2006)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mitchell-county/zoning/5.20@2023-08-08-575b076761

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Mitchell County Zoning Ordinance, Sec. 5.20. Telecommunication antennas and towers | Georgia Commons