Montezuma · Ordenanza de zonificación
Part II - CODE OF ORDINANCES / Chapter 102 - ZONING / Article X - ADMINISTRATION, ENFORCEMENT, AND PENALTIES
Sec. 102-273. Application for building permit.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All applications for building permits shall be accompanied by plans in duplicate, drawn to scale, showing the actual dimensions of the lot to be built
upon, the sizes and locations on the lot of any existing buildings or structures, the shape, size, height, use, and location on the lot of the building or structure proposed to be erected or altered, and such other information as may be necessary to provide for
the enforcement of the provisions of this chapter. If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid.
Historia
(Code 1990, app. C, § 123; Ord. No. 134, § 123, 5-13-1975)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.