Ir al contenido
Georgia Commons
Menú

Mount Zion · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 34 - ZONING / Article IX - COMMUNICATION TOWER REGULATIONS

Sec. 34-366. Requirements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) All towers and antennas in excess of 70 feet located in an industrial zone shall be set back according to front yard requirements stated in Table 34-177.1. Towers with trigger links shall be set back one-half the distance of the length of the tower when located in areas zoned general commercial and set back the full height of the tower if located in any residential or rural development zoned district.

(b) At the time of filing the application for a tower, the applicant shall provide a site plan and information regarding topography, coverage zone, and tower height requirements.

(c) Shared usage of towers and antenna facilities is encouraged, and towers shall be designed to accommodate such uses.

(d) Accessory structures shall be limited to usages associated with operation of the antennas or towers and shall be appropriate in scale and intensity.

(e) All towers and antennas shall be equipped with an anti-climbing device such as a six foot wall, fence or other appropriate devices to prevent unauthorized access.

(f) All towers and antennas must meet or exceed current standards and regulations of the Federal Aviation Administration, the Federal Communications Commission or such governing agency guidelines as may be established by named agencies. All towers and antennas must be updated and brought into conformity with such standards and regulations within six months of their adoption. The failure to comply with this provision shall be grounds for the city to require removal or re-permitting of the antenna or tower at the owner's expense.

(g) At the time of application for building permit, the plans for tower or antenna construction shall be certified by an independent registered structural engineer as meeting all current safety and design standards of all applicable codes. Cost of engineering evaluation shall be the responsibility of the individual or corporation applying for the building permit.

(h) Applicants are required to explore and fully utilize existing tower and antenna space and are required to bear an equitable share of capital, operating and other expenses in connection with such shared usage.

(i) Nonresidential sites are encouraged for tower location where possible and use of platted lots in existing subdivisions are discouraged.

(j) In addition, all such towers and antennas shall be designed to minimize visual and scenic impact when located on slopes greater than 15 percent or on top of such slopes.

(k) Any tower approved under the provisions of this article which is not utilized by any communications service provider for any communications-related purpose for a period of 12 consecutive months shall lose any privilege of special exception previously granted by the city council and must therefore be re-submitted for approval prior to use for any purpose not permitted by the existing zoning.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 10-12-2004(3), § 12.6)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mount-zion/zoning/34-366@2026-11-11-3a38cb252c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Mount Zion Zoning Ordinance, Sec. 34-366. Requirements | Georgia Commons