Ir al contenido
Georgia Commons
Menú

Nashville · Ordenanza de zonificación

Appendix A - ZONING / 9 - SPECIAL PROVISIONS FOR CERTAIN USES

9-3.1. The minimum size shall be two (2) acres.

Sobre este texto

  • As published by Municode, current through 2021-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

9-3.2 The park shall have minimum side yards of twenty (20) feet, minimum rear yard of twenty (20) feet, and a front yard of at least twenty (20) feet greater than that required for other uses permitted in the district.

9-3.3 Each mobile home shall be connected to an approved water and sewer system.

9-3.4 The minimum lot area per mobile home shall be not less than four thousand (4,000) square feet with a minimum stall width of forty (40) feet, where public sewer and water are available.

9-3.5 The minimum distance between any two (2) mobile homes or between any mobile home and any other building in the park shall be twenty (20) feet.

9-3.6 A twenty-foot private drive(s), paved and properly drained, shall serve all mobile home stalls and [shall] be drained so as to prevent damage to adjoining property, public or private.

9-3.7 Each mobile home lot shall be clearly defined by means of concrete, steel or iron pipe markers placed at all corners.

9-3.8 At least five hundred (500) square feet per mobile home lot, not to be a part of the required mobile home lot, shall be provided in one (1) or more locations for community playground and recreation purposes.

9-3.9 All property lines of a mobile home park which abut any zoning district other than another MHP district shall be screened as described in section 3-15.

9-3.10 No mobile home park shall be occupied by a greater number of mobile homes than that authorized in the approved building and inspection permits. No mobile home park shall be enlarged or extended unless a separate building permit and a separate certificate of occupancy have been issued.

9-3.11 Any new mobile home park is subject to review and approval of the City of Nashville planning commission prior to approval of a building permit to insure compliance with the aforementioned requirements.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:nashville/zoning/9-3.1@2021-03-08-c3d221197b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.