Ir al contenido
Georgia Commons
Menú

Newborn · Ordenanza de zonificación

Article 5 - REGULATIONS APPLYING TO ALL DISTRICTS / Division 525 - SIGNS

Sec. 525-090. Procedures.

Sobre este texto

  • As posted on the city's website, retrieved 2026-11-11

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Permit.

1. A permit is required before a sign may be erected, enlarged, relocated or improvements costing 60% or more of the sign's replacement value are made. All signs using electricity require an electrical permit.

2. A permit shall be issued if the plans and specs conform to this Division. Applications shall be accompanied by all the info required hereunder and such other info the Town may require in the exercise of sound discretion to determine compliance. Standardized sign plans may be filed with the Town in fulfillment of this requirement, although site plans shall be filed with each application.

3. Each application shall contain an agreement to indemnify, defend and save the Town harmless from all damages, demands or expenses which may be caused by the sign or sign structure.

4. Every sign for which a permit is required shall be marked with the name of the permittee and have the number of the permit affixed on the sign so the info shall be readily accessible, legible and durable.

B. Application. Shall be filed on Town forms. The application shall describe and set forth the following and any additional info pertinent, as requested by the Town to determine compliance:

1. Type of sign;

2. Scaled site plan showing location, and plan describing the construction;

3. Scaled Elevation drawing showing height and sign face dimensions ;

4. Square footage, height and use of existing signage;

5. Name and address of sign owner;

6. Written consent of the property owner or agent;

7. Name, address, and phone number of the sign contractor.

C. Expiration. A permit shall expire if the sign has not been completed within 6 months; provided, however, one 6-month extension of the permit shall be granted if an additional permit fee has been paid prior to expiration.

D. Processing. After receipt of a properly completed application, the Town shall commence review. Review shall be completed and the permit issued or denied by the 30th day after submission.

E. Fees. No permit shall be issued until the fees, as adopted by the Town, have been paid.

Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:newborn/zoning/525-090@2026-11-11-bb5df02445

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Newborn Zoning Ordinance, Sec. 525-090. Procedures | Georgia Commons