Ir al contenido
Georgia Commons
Menú

Oakwood · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 54 - ZONING / Article III - DISTRICTS AND USES / Division 1 - GENERALLY

Sec. 54-88. Minimum setback and buffer requirements by zoning district.

Sobre este texto

  • As published by Municode, current through 2025-07-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following table contains minimum setbacks and buffer requirements by zoning district:

District Principal Building Setbacks (in feet) Front, Arterial or Collector Streets Front, Other Streets Side Rear

R-1 40 25 10(D) 20(D)

R-2 40 25 25(D) 25(D)

R-3 40 25 25(D) 25(D)

R-4 40 25 30(D) 30(D)

MHP * * * *

C-1 60 40 10(A) 20(A)

C-2 60 40 5(B) 10(B)

O-P 60 40 10(A) 20(A)

M-1 60 40 5(B) 10(B)

M-2 60 40 5(C) 10(C)

A-1 60 25 10 20 *See sections 54-431 and 54-432.

NOTE. Additional setbacks may be required for specific uses as provided in permitted uses sections of particular zoning districts.

(A) When development in this district abuts an A-1, R-1 or R-2 zoning district boundary, a buffer with a minimum width of 50 feet shall be provided along the entire property line abutting said zoning district.

(B) When development in this district abuts an A-1, R-1 or R-2 zoning district boundary, a buffer with a minimum width of 75 feet shall be provided along the entire property line abutting said district. A 50-foot-wide buffer shall be required when this district abuts an R-3, R-4, MHP or O-P zoning district.

(C) When development within this district abuts an A-1, R-1 or R-2 zoning district boundary, a buffer with a minimum width of 75 feet shall be provided along the entire property line abutting said zoning district. A 50-foot-wide buffer shall be required when this district abuts an R-3, R-4, MHP or O-P zoning district.

(D) There shall be a 50-foot landscape buffer between all residential developments.

Setbacks and separation between buildings within the same development shall meet the same setbacks as the development in the R-1, R-2, R-3 and R-4 zoning categories.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 220, art. XX, § 2001, 4-11-1994; Ord. No. 2022-CO-03-829, § 1, 6-13-2022)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:oakwood/zoning/54-88@2025-07-14-4456816186

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Oakwood Zoning Ordinance, Sec. 54-88. Minimum setback and buffer requirements by zoning district | Georgia Commons